Page 59 - FINAL Combined CB2_Neat
P. 59

On the Boards

































              Wheaton College Armerding Center for Music and the Arts: Renovation of the existing Armerding Building (to the right in the
              rendering above) was completed in Fall 2017 and occupied by the College. To the left in the rendering is the new Concert
              Hall addition; construction documents have been issued and the CM is preparing a GMP proposal.





























                Proposed Lobby                                         Proposed Concert Hall
   54   55   56   57   58   59   60   61   62   63   64