Page 18 - [Seoyoung] BIM Brochure_English
P. 18
PRIZE
st
2017 BuildingSmart BIM AWARDS 1 Prize
CIVIL BIM ( Seoul-Sejong Highway / GoDeok Bridge )
We applied BIM to the construction of the concrete cable-stayed bridge
in Lot 14 of the Seoul-Pocheon (Anseong-Guri) Expressway construction
project. 3D construction management and planning, 4D simulation, and
3D clash review were carried out. Therefore, design errors and the
adequacy of the construction were thoroughly reviewed and the quality
of design and construction was notably improved.
2015 Korea Institute of BIM Technology Prize
Development of 3D Electronic Standard Drawings
( Adopted as the official standard for Korea Expressway Corporation )
The existing standard drawings are expanded to 3D electronic standard
drawings (3D PDF), establishing a 3D review environment. As a result,
the user’s understanding was improved, minimizing errors, and allowing
real-time review through mobile devices( tablet PC, smart phone ).