Page 9 - Magazine.cdr
P. 9
HSE IMPROVEMENTS
HSE KAIZENS
BEST 1 FROM FGD PROJECT RIHAND
BEFORE AFTER
No Proper Access Proper Stair Provided
BEST 1 FROM FGD PROJECT MOUDA
BEFORE AFTER
Chance of material fall from the top floor in the access way Head protection (Sheet) provided
BEST 1 FROM FGD PROJECT FARAKKA
BEFORE AFTER
Hand tools using on height without securing Provided 1 mtr length of 8 mm PP Rope and tied hand tools on both sides
8