Page 25 - Performance / Statistics
P. 25
Staff details of TRD HYB Division
SANCTIO App.
CATEGORY GRADE ACTUAL VACANCY
N Under Trg
Supervisors 6 11
SSE 9300-34800 4 0 8 + 4
JE 9300-34800 2 2 3 + 1
Artisans 7 17
Sr.Tech 9300-34800 2 0 2 0
0 - 3
Tech-I 5200-20200 4 0 [1 post down graded
to Tech-II]
Tech-II 5200-20200 0 0 1 + 1
Tech-III 5200-20200 1 0 2 + 12 + 13
Assistants 9 7
Assistants 5200-20200 9 0 7 - 2
Grand Total 22 2 35 + 14
Un-skilled Out sourcing staff 11 nos. were engaged for OHE maintenance.
IV. Performance Statistics:
Proposed Action Plan items for the year 2020-21
Sl. Item in brief Yearly Progress up to
No Target 31.01.2021
Replacement of rubber hose pipes in Tower Car with braided
1 1 1
pipes
Isolators: Replacement with correct connector or jumper
2 13 13
wherever mismatch of terminal connector Jumper is observed
Provision of out rigger arrangement at isolators (Special
3 13 13
Drive: 3)
Status of Maintenance of OHE Assets:
Cum. Cum. % of
S. Description Yearly Target Cum. target up progress upto schedules
No to 28.02.2021 28.02.2021 done.
1 Turnouts 29 29 29 100 %
2 Crossovers 46 46 46 100 %
3 Section Insulators 58 58 57 98 %
4 PTFE 12 9 8 89 %
5 AOH OF ATDs 281 281 273 97 %
6 AOH of IOL 47 47 42 89 %
7 AOH of UIOL 58 58 55 95 %
8 IOH of CLs 1075 1075 981 91%
9 Isolators 66 66 63 95 %
124