Page 28 - Performance / Statistics
P. 28
DETAILS OF ROBs IN KCG - FM SECTION OF HYB division
Sl.
No. Location Section ROB Station Contact wire ht.in
mts
1 10/5-7 KCG – FM 5.55
ROB DQR
2 10/6-8 KCG – FM 5.64
3 13/19-21 KCG – FM 5.55
ROB HPG
4 13/20-22 KCG – FM 5.45
5 15/2-4 [ROAD- 1] KCG – FM 5.65
6 15/1-3 [ROAD- 2] KCG – FM 5.70
7 15/1-3 [ROAD- 3] KCG – FM ROB FM 5.54
8 15/1-3 [ROAD- 4] KCG – FM 5.78
POWER LINE CROSSINGS Details IN Kacheguda - Falaknuma Section
Clearance from OHE
Section Between Type of to bottom of Powerline
Sl.No KM.no/ Location
Stations Voltage Xing conductor
( in meters)
1 KCG - MXT 8/27-29, 8/28-30 33 KV 5.89
2 FM - BDVL 15/17-18 33 KV 9.08
3 KCG - MXT 8/25-27, 8/26-28 132 KV 7.58
4 FM - BDVL 15/18-19 132 KV 8.63
Punctuality cases- Failures:
SlNo Reason 2019-20 (APR-JAN) 2020-21 (APR- JAN)
1 Block burst - -
2 Insulator failures - -
3 Maintenance - -
4 Miscellaneous 3 -
5 Head on Collusion 1 -
Total 1 -
127