Page 183 - Vessel Sanitation Program 2018 Operations Manual
P. 183

VSP 2018 Operations Manual




               8.0  Integrated Pest Management (IPM)

               This section includes the following subsections:
               8.1     Plan Development, Evaluation, and Use of Pesticides
               8.2     Pest Control
               8.3     Knowledge

               References for 8.0 Integrated Pest Management (IPM) can be found in Annex 14.8.



                   8.1        Plan Development, Evaluation, and Use of Pesticides


                       8.1.1   IPM Plans

                          8.1.1.1    IPM Plan (40)
                                     Each vessel must have an IPM plan to implement effective monitoring and
                                     control strategies for pests aboard the vessel.

                          8.1.1.2    Monitoring (40)
                                     The IPM plan must set a schedule for periodic active monitoring
                                     inspections, including some at night or during periods of no or  minimal
                                     activity.

                          8.1.1.3    Logs (40)
                                     The IPM plan must include provisions for logs for active monitoring of
                                     pest sightings in operational areas of the vessel. The IPM plan also must
                                     include provisions for training of crew members in charge of log
                                     completion. The time of the active monitoring inspections must be
                                     recorded in the log.

                          8.1.1.4    Passive Surveillance (40)
                                     The IPM plan must include passive surveillance procedures such as glue
                                     traps or other passive monitoring devices and must include the location of
                                     each. A passive device monitoring log must be maintained.


                          8.1.1.5    Action and Follow Up (40)
                                     When pests are observed during an inspection, the log must include action
                                     taken as well as follow-up inspection results.

                       8.1.2   Plan Evaluation

                          8.1.2.1    Evaluation (40)
                                     The vessel’s IPM plan must be evaluated for effectiveness periodically or
                                     whenever there is a significant change in the vessel’s operation or
                                     structure (e.g., renovation).




                                         8.0 Integrated Pest Management (IPM); 154
   178   179   180   181   182   183   184   185   186   187   188