                          12.13.3.2 Rescinding Variance
                                     VARIANCE approval may be rescinded at any time for noncompliance
                                     with these conditions or if it is determined that public health could be
                                     compromised.


                          12.13.3.3 Areas Not Identified (44)
                                     Procedures, systems, EQUIPMENT, technology, processes, or activities
                                     not identified in the scope of this manual must not be tested or introduced
                                     operationally onboard any vessel until the concept is submitted in writing
                                     to the VSP Chief for review. If the review determines the concept is within
                                     the scope of the VSP Operations Manual, written procedures, control
                                     measures, or a complete VARIANCE submission may be required.