138                 Alfonso T. Sarmiento and Edgar Gutierrez

                          The solution yielded the results shown in Table 2. This table also includes parameters
                       a1, a2, a3, a4 which are the new equilibrium points for the state variables of interest.
                          Figure 5 shows the behavior of the state variables when this revised policy is applied.
                       The  system  has  reached  equilibrium  approximately  in  9  weeks  (response  time).  This
                       figure also shows that the convergence of ADE has caused the asymptotic stability of the
                       four variables of interest. This was achieved mainly by increasing the parameter values
                       Desired Days Supply of Parts Inventory, Time to Correct Parts Inventory and Supplier
                       Delivery Delay and decreasing several other parameter values including Labor Recruiting
                       Delay, Preforms Cycle Time, and Presses Cycle Time.

                                     Table 2. Parameter values for the stabilization policy

                        Parameter                                             Value       Unit
                        Desired Days Supply of Parts Inventory                3.46        Weeks
                        Time to Correct Parts Inventory                       2.79        Weeks
                        Preforms Cycle Time                                   1.36        Weeks
                        Presses Cycle Time                                    1.70        Weeks
                        Time to Correct Inventory                             1.47        Weeks
                        Supplier Delivery Delay                               2.93        Weeks
                        Time to Adjust Labor                                  1.24        Weeks
                        Labor Recruiting Delay                                0.5         Weeks
                        a1 (EP for Preforms WIP Level)                        8828        Units
                        a2 (EP for Presses WIP Level)                         13739       Units
                        a3 (EP for Finished Goods Inventory)                  3275        Units
                        a4 (EP for Labor)                                     44          People


                                6,000


                                5,500



                                5,000


                                4,500



                                4,000
                                    0   2   4  6   8  10  12  14  16  18  20  22  24  26  28  30
                                                            Time (week)
                                 Maximum Capacity                                   units/week

                       Figure 6. Maximum capacity of lenses manufacturing department.
   149   150   151   152   153   154   155   156   157   158   159