Page 31 - สำนักบำรุงทางรายงานประจำปี 2563
P. 31

AMAGE INSPECTION,
                         STRUCTURAL EVALUATION
                         AND REHABILITATION OF
                        A BALANCED CANTILEVER
                       BRIDGE WITH CENTER HINGES



                      Bridge inspection and evaluation of the  and will have no further effect on the movement of
               Phra Pinklao Bridge, having structural configuration  the hinge bearings in the future after replacement.
               of a balanced cantilever bridge with center hinges,     Responses of the bridge structure
               is carried out in order to determine appropriate  and identification of any structural damages and
               measures for bridge rehabilitation. The bridge  deficiency are examined by employing diagnostic
               structure is a 3-span, continuous prestressed  load testing under predetermined loading to gain
               concrete box girder with a total length of 280  physical insight into load-carrying behaviors
               meter and a width of 26.6 meter supporting  regarding structural deterioration and susceptible
               6 traffic lanes. The investigation tasks include  damages that may occur due to bridge aging and
               1) bridge visual inspection, 2) measurement of  center hinge deficiency. Nine 3-axle domestic
               bridge alignment and profile, and joint movements,  trucks with the predetermined gross weight of 245
               3) bridge load test and behaviors measurement,  kN per truck are employed as test load. Based on
               4) structural analysis and load-rating evaluation,  the test results, the overall structural responses
               and 5) appropriate bridge rehabilitation plan.   are in normal conditions. No indication regarding                                สํะพื่านัสํมเด็จึพื่รุะป็ิ่นัเกล้า
                      Based on the results of bridge inspection,  any loss of load-carrying capacities or structural                      เกิดความเสํียหายบํรุิเวณกงกลางสํะพื่านั
                                                                                                                                                          ึ
                                                                                                                                                          �
               structural damages of the center hinge bearings in  deficiency can be observed. Upon removal of the                        Hinge Bearing ที�ทําหนั�าที�รุับํแรุงเฉือนั
               a critical state are reported. The damages include  test load (unloading), elastic recovery of strains and                 ชํารุุดเสํียหาย เนัื�องจึากการุหดต้ัวและ
               permanent deformation of stayed plates and plunger  displacements of the box girder can be illustrated.                    การุคืบํต้ัวข่องคอนักรุีต้อันัทําให�ความ
               edges of the hinge bearings causing the bearing  No permanent deformation of the bridge structure
               movement to be restrained and direct impact on  is reported.                                                               สํามารุถึในัการุใช้งานัลดลง  จึําเป็็นัต้้อง
               serviceability and load-carrying behaviors of the     A three-dimensional finite element model                             ทําการุซึ่่อมแซึ่มแก้ไข่ป็รุับํป็รุุง Hinge
               bridge structure. According to the measurement  is employed in the structural analysis of the bridge                       Bearing ให้สํามารุถึรุับํแรุงได้ต้ามที�ออกแบํบํ
               results of bridge geometric surveying, no  structure. The finite element model is verified and                             ไว้ เพื่่�อให้สํามารุถึใช้งานัได้ต้ามป็กต้ิและ
               abnormalities of bridge alignment and profile of  updated on the basis of the measurement results                          ป็ลอดภัย
               the existing structure are found. In conjunction  employing a sensitivity-based finite element model
               with the results obtained on creep and shrinkage  updating technique. The results of load-rating
               deformation analysis of the bridge structure, it is  evaluation yielding sufficient load-carrying capacities
               anticipated that the accumulative movement of  of the existing box girder are reported.
               the bridge components is likely due to creep and     According to the investigation findings,
               shrinkage of concrete material under long-term  it is anticipated that appropriate implementation
                                                                                                                                                                    DRR
               compression effect. It is estimated that under the  of the planar hinge bearing concept would yield a                                               maintenance
               current conditions of the existing structure, the  most suitable and effective method for the center
               bridge creep nearly approaches a constant state  hinge bearing replacement of the bridge structure.                                                  31
   26   27   28   29   30   31   32   33   34   35   36