What is Site Investigation…?   Boreholes Spacing



                                    Building Works                                         Road Works
 •   A process of site exploration consisting of site inspection, boring, sampling and testing so as to
 obtain geotechnical information for a safe, practical and economical geotechnical evaluation or   Spacing of boreholes for multistory building normally   The spacing of boreholes for highway projects should
 design          ranges from 15m to 45m                                be between 60m – 600m
                 (depending on the uniformity of strata, geological    (depending on geological formation whether the
 •   The main objective of site investigation is to determine the properties of soil, rock and   conditions and foundation type)   ground is flat, undulating, hilly terrain, peat, soft soils,
 groundwater as they may affect the choice of the foundation works in terms of cost, time and   swampy or limestone areas)
 construction method of a project
                 Two boreholes for a block of low rise building on flat   For road alignment passing through the same type of
                 land is sufficient                                    geological formation, less number of boreholes are

                                                                       required or spacing should be 500m interval or more


 Site Investigation
                 For problematic and erratic soil formation like       For road alignment passing through complex,
                 limestone areas, uncontrolled filled ground or boulder   variable/different geological formations, more
                 abundant areas, or structures sensitive to settlement,   boreholes at closer spacing are necessary
 Desk Study & Site   Boring   Sampling   Field Testing   Lab Testing   more boreholes are required
 Reconnaissance                                                        For slopes on hilly terrain, recommended 3 numbers
                                                                       of borehole on its vertical cross section (i.e. crest,
                                                                       mid-section and toe)
 Figure 1: Components of Site Investigation

                    Note:
                    i.   There are no hard and fast rules in determining the numbers and spacing between boreholes
                    ii.   However, it is good practice to follow the guidelines as stated above