Page 84 - Handbook GEOTEKNIK_Final_Neat
P. 84

Minimum Requirement for Pile Load Test                                                                                            Acceptance Settlement Criteria





                    •    Maintain Load Test (MLT):                                                                                                    •   For pile load test, based on JKR Standard Specification For Building Works 2014,
                          –  1% of the total pile points or 2 nos per pile size /pile type, whichever is higher                                           Clause 2.9.6.3:



                    •    Pile Dynamic Analyzer (PDA):                                                                                                           The total settlement (δ ) under Working Load (WL) ≤ 12.5mm; or
                                                                                                                                                                                          WL
                          –  3% of the total pile points for normal ground condition; and
                          –  7% for erratic ground condition                                                                                                    The total settlement (δ  2xWL ) under twice the working load (2*WL) ≤ 38.0mm or

                                                                                                                                                                 10% of pile diameter / width whichever is the lower value; or

                                       Pile Type                               Duration After Driven                                                            The residual settlement (δ   residual ) after removal of the test load at working load ≤

                                                                                                                                                                 [(dia. of pile or diagonal width for non-circular pile /120) + 4]mm or 12.5mm

                          End Bearing Pile                                            7 days                                                                     whichever is the lower value.

                          Combination of end bearing & skin friction
                          pile                                                       14 days


                          Friction pile, borepile and micropile                      28 days

                         Table 16: Minimum Waiting Period to Carry Out Load Test

                                Note : Recommended duration of pile test execution based on JKR practice.







       68  PUBLIC WORKS DEPARTMENT MALAYSIA                                                                                                                                                                                      GEOTECHNICAL ENGINEERING HANDBOOK  69