Page 91 - Handbook GEOTEKNIK_Final_Neat
P. 91

Piling Problems in Rock   Problems of Slender & Long Pile in Deep Soft Soil


                                                                       HAMMER
                           1. CRUSHING OF PILE HEAD WHEN THERE IS
                           ECCENTRIC HAMMERING OR PILE  TILTING /
                           DEFLECTION  DUE  TO  HARD  OBSTRUCTION                            2. LONGITUDINAL SPLITTING OR
                           OR INCLINE BEDROCK                                                SPALLING OF PRECAST CONCRETE
                                                                                             PILE WHEN ENCOUNTERING HARD
                                                                                             DRIVING ESPECIALLY AT NON-
                                                                                             CHAMFERED CORNERS OR LOCALIZED
                                                                                             HONEYCOMB NEAR PILE HEAD

                                                                                             3. PROBABLE TENSILE CRACKS DUE TO
                                                                                             HIGH TENSILE STRESS WHEN THE PILE
                                                                                             SUDDENLY PUNCHES THROUGH THE
                                                                                             LOCALIZED SAND LENSE, ESPECIALLY
                             4. DISLOCATION / SEPARATION OF PILE                             WHEN DIESEL HAMMER IS USED OR
                             JOINT WHEN THE PILE ENCOUNTERING HIGH                           WHEN DROP OF HAMMER > 1m
                             TENSILE DRIVING STRESS
                                                                                             5. WHIPPING OR DISPLACEMENT
                                                                                             EFFECT OF LONG SLENDER PILE CAN
                   NOTES:                                                                    RESULT IN LOSS OF FRICTIONAL
                                                                                             RESISTANCE IN STIFF STRATA (LESS
                   1. MOST OF THE “8” PROBLEMS LISTED CAN BE                                 PROBLEM IF L/r < 100 )
                   MITIGATED BY USING LARGER PILES (L/r < 100) PLUS
                   COMPLIANCE WITH THE TECHNICAL REQUIREMENTS
                   AS SPECIFIED IN MS1314 PART 1 (APPENDIX A & C,
                   WORKMANSHIP & INSPECTION REQUIREMENTS etc.).
                   THESE PROBLEMS ALSO CAN BE MINIMIZED BY USING
                   LARGE HYDRAULIC HAMMER WITH SMALL DROP      LOCALIZED                6. POSSIBLE LONGITUDINAL CRACKS
                   (<0.6m)                                     SAND LENSE               DUE TO EXCESSIVE TWISTING /
                                                                                        DEFLECTION WHEN THERE IS
                   2. PROBLEMS 2,3,4 & 6 CAN BE MINIMIZED OR                            DIRECTIONAL STABILITY PROBLEM
                   MITIGATED BY USING PRE-STRESSED SPUN PILES                           (L/r > 100)
                   WITH EFFECTIVE STRESS > 7 N/mm 2
                   3. PROBLEM 4 CAN BE EFFECTIVELY MITIGATED BY
                   USING PRE-STRESSED SPUN PILES WITH COLLAR /
                   COUPLE PLATES WELDED JOINTS


                                   7. WHEN STRIKING HARD ERRATIC OR               8. EXCESSIVE DEFLECTION UP TO 2.5m
                                   INCLINED BED ROCK, PILE TOE MAY BE             HAS BEEN REPORTED FOR LONG
                                   DAMAGE, CAN BE MITIGATED BY                    SLENDER PILE (L/r > 120) (DIRECTIONAL
                                   PROPER “OSLO” POINT                            STABILITY), CAN BE CHECKED BY
                                                                                  USING CLOSED END SPUN PILES
                                                                  DEFLECTION
 91                                                                                                                     92