Comment for Development Control

                 Consultee:               Oliver Benson BSc (Hons)
                                          Contaminated Land and Environmental Protection Officer
                                            st
                 Date of reply:           21 march 2019
                 Planning reference       DM/19/1025
                 Site address:            E D F Energy Wealden House Lewes Road Ashurst Wood
                                          East Grinstead West Sussex RH19 3TB
                 Description:             Proposed new build residential development consisting of
                                          54 units following the demolition of all existing site buildings.
                 Other reference:         SR/19/0956

                 Main Comments:

                 The application looks to build 54 residential units following the demolition of the current
                 buildings on site.

                 Mapping indicates that the site has two in-filled pits within its curtilage, the contents of which
                 are  unknown.  There  is  also  an  electricity  substation on  site.  Substations  due  to  their
                 composition  have a number of products and  materials  which  may have  the potential  to
                 cause localised contamination. Of initial concern are PCB’s (Poly Chloride Biphenyl’s) and
                 any localised mineral oils used as lubricants. These particular chemicals are not obvious to
                 the naked eye and would have implications for human health.

                 Due to the above, and the size and sensitivity of the proposed development, a phased
                 contaminated land condition should be attached to ensure the site is safely developed for
                 its end use.

                 Additionally  a  discovery  strategy  should  also  be  attached,  so  that  in  the  event  that
                 contamination not already identified through the desktop study is found, that works stop until
                 such time that a further assessment has been made, and further remediation methods put
                 in place if needed.


                 Recommendation: Approve with conditions

                        1)     No works pursuant to this permission shall commence until there has been
                               submitted to and approved in writing by the Local Planning Authority before
                               development commences or within such extended period as may be
                               agreed with the Local Planning Authority:




                               a) A desk study report documenting all the previous and existing land uses
                                   of the site and adjacent land in accordance with best practice including
                                   BS10175:2011+A1:2013 Investigation of potentially contaminated sites
                                   - code of practice. The report shall contain a conceptual model showing
                                   the potential pathways that exposure to contaminants may occur both
                                   during and after development;

                                   and unless otherwise agreed in writing by the LPA,

                               b) A site investigation report documenting the ground conditions of the site
                                   and incorporating chemical and gas analysis identified as appropriate
                                   by the desk study created in accordance with BS10175:2011+A1:2013