Page 64 - August-2020-Issue
P. 64

BEML Flags off Last Train set for



              Kolkata Metro (East-West) Project




                   EML  Ltd.,  flagged  off  the   in revenue operation. The rev-  control and regenerative brak-
                   last  trainset  for  Kolkata   enue service was inaugurated by   ing for energy saving.
              BMetro (East-West) project      Hon’ble Minister  of  Railways  &   • Train  sets  operate  with  ATP/
              from  its Metro coach  factory at   Commerce, Mr. Piyush Goyal in   ATO and is interfaced with
              Bangalore Complex. Mr. Deepak   presence of Mr. Babul Supriyo,   CBTC signalling system (which
              Kumar  Hota,  CMD,  BEML  has   Union Minister of State  for     is one of the best and latest tech-
              flagged-off  the  metro  train  set   Environment.  Forest  &  Climate   nologies in the world) to reduce
              in the presence of Company      change at Kolkata. While taking a   headway, ensure train stopping
              Directors  and  other  senior  offi-  ride in the metro car the Hon’ble   accuracy and passenger safety.
              cials of BEML & KMRCL.          Minister lauded BEML for intro-
              BEML  secured  the contract for   ducing a world class metro car to   • Passenger capacity of 2068 per-
                                                                               sons per train set
              14 train sets (6 cars each), valued   the ‘City of joy’!
              at  approx.  900  cr.  from  Kolkata   Some  of  the key features of the   • Energy efficient LED lights
              Metro Rail Corporation. BEML    train sets include:             • Automatic  audio-visual  an-
              independently completed  the                                     nouncement and display sys-
              design,  manufacturing activi-  • Stainless  Steel  car  body  fur-  tem for passengers
                                               nished with world class  in-
              ties and the delivery of the proto
              type train set was  done  during   teriors and customized air   Speaking on  the occasion  Mr.
              March 2018, which was subjected   conditioning  suiting  local  Deepak  Kumar  Hota,  CMD
              to extensive testing and trials on   requirements.              BEML  said,    'We  are  on  track,
              KMRC mainline including statu-  • Bogie  for  750V  DC  Third  Rail   as we despatched the last of the
              tory testing by RDSO & CRS and   application is  designed  &  de-  14  trainsets  for  Kolkata  Metro
              cleared all the tests. Subsequently,   veloped  by  BEML  for  the  first   (East - West) project for KMRCL.
              BEML built KMRC trainsets were   time.                          We have proved our capabilities
              put to revenue operation since   • IGBT  based  microprocessor   and expertise in supply of Metro
              February  2020  and  are  operat-  controlled 3 phase asynchro-  coaches. An epitome of successful
              ing satisfactorily. Further, 6 train   nous drive with VVVF (Variable   ‘Make  in India’  initiative in the
              sets are ready for deployment    Voltage  Variable  Frequency)   rolling stock industry'.




              Contd... from # 63
              the country's indigenous coal   WCL  and  BCCL  account  for 5   coal supply.  These two factors
              output, but may not be viewed   blocks each. ECL has 3 blocks   will determine the sale of coal in
              as competition to Coal India. It   whereas 2 belong to CCL and 1 to   the competitive environment.
              would not unsettle us'.         MCL. None of the 41 blocks put   CIL's advantage of over four and
              CIL under its fold holds  close   up for commercial  mining auc-  half decades of core competence,
              to 54% of the country's entire   tion belong to Coal India.     skilled human resource, estab-
              coal resource base of 319 Billion   Irrespective of impending com-  lished infrastructure, streamlined
              Tonnes (BTs). The allocation of 16   petition CIL,  over  the years,  has   operations, infusion of capital in
              blocks, few months back, by the   been working on tightening its   upgrading the technology and
              Government to the state owned   belt  in  becoming  a  cost-efficient   evacuation  logistics,  robust coal
              Maharatna PSU, saw its resource   producer in lowering the cost   resource base and a slew of con-
              capacity swell by around 9 Billion   per tonne of coal produced and   sumer friendly measures will
              Tonnes (BTs) to 172 BTs. Of these,   focusing on improved quality of   give it an edge.



              64    KaleidOscope  August, 2020
   59   60   61   62   63   64   65   66   67   68   69