Page 19 - DCBE_LIFE_Magazine_OCTOBER2020_OPF
P. 19

OCTOBER 2020                                         19                              DeCordova Bend Estates LIFE

        announcements & information




            Dumpster & Roll Off Container Usage                    Architectural Permit Information
                                                                     (Permits are Required Before Construction is Started.
        Availability will be increased for member usage of the dumpsters  The penalty for starting a construction without an approved
        and  roll  off  container  in  the  trailer  storage  area  beginning  this  permit will cause permit fees to double.)
        Saturday.  The new hours will be from dawn to dusk throughout the
        day on Wednesday & Saturday.  For access to the area you will
        need to call either security gate at the below listed numbers.  A permit is required any time there is a change to the exterior
                                                               of the property.  This includes but not limited to:
             Main Gate: 817-326-4640 / North Gate: 817-326-5277
                                                               - Adding a patio, shed, covering, deck, room addition etc.
                          Reminders for Usage                  - Adding a window/door where there use to be brick, stone or other
                                                                 material.
        Dumpsters (Smaller Containers)
        - All items must be fully contained within the dumpster  - Changing the type of roofing material or color of roofing material.
        - No batteries                                         - Cement where there use to be wood, gravel, dirt, grass or other
        - No tires                                               material.
        - No roofing materials                                 - Changing outside of the house from siding, brick or rock to a
        - No appliances with Freon                               different type of material.
        - No gas powered implements                            - Any color change, house color, trim color, accent colors, shutters etc.
         -No paint that is still liquid                        The Architectural  Control  Committee  meets  on  the  second  and
        - Construction materials must be completely disassembled and cut   fourth Mondays each month (except holidays). The deadline for
          into lengths of not more than three feet             permit applications is 12:00 pm Wednesday prior to the meeting.
        - All boxes must be broken down flat                   The sooner you can submit all paperwork the better to give time to
        - No household garbage                                 review for completion and schedule inspections, if necessary.  If you
        - No bagged leaves and grass clippings                 have any questions don’t hesitate to call Stephanie at 817-326-2381.
        - No overstuffed furniture, mattresses or box springs  We would like to acknowledge and show appreciation to those
        - No large appliances (clothes or dish washers or dryers)  contractors and members who adhere to the Rules and Policies and
                                                               respect the time frames we must work with.
        30-yard Roll Off (Large Container)
        - No batteries                                         Applications cannot be pushed through if not received by the deadline,
        - No paint                                             you will have to wait for the next meeting, no exceptions.
        - No tires
        - No oil
        - No appliances with Freon in them, the appliance must be red
          tagged to show that the Freon has been professionally removed.


               COMMITTEE VOLUNTEERS


        The  DCBE  Standard  Operating  Procedures  state  that  DCBE
        members may serve on no more than two (2) Association based
        committees.  If you would like to serve on a committee, please
        complete a DCBE Committee Service Volunteer Form.
        Forms are available at www.decordovabendestates.org or at the
        front  receptionist  desk.    Please  submit  completed  forms  to  the
        DCBE Administration Office.
        Volunteers are needed on the following Committees:
                            Finance  /  Golf
                          Security & Grievance
                         House & Entertainment
                      Architectural  /  Recreational
                         Facilities Maintenance
                           Legal & By-Laws
                         Long Range Planning
   14   15   16   17   18   19   20   21   22   23   24