Page 56 - be'ah Annual Report
P. 56
Striving for Excellence:
Industrial Waste Operations
The control of the movement of industrial and by making it possible for SME’s to transport the waste Manifest flow
hazardous waste streams is extremely important to in a controlled manner. be’ah intends to support
avoid dumping of waste leading to environmental the development of several small and medium
problems for nature, wildlife and future generations. enterprises by further strengthening the knowledge Waste generator goes to be’ah website Manifest reviewed by be’ah waste evaluator
contacts Waste Generator to
www.beah.om, then clicks on the Hazardous
be’ah waste evaluator.
For the tracking of waste streams be’ah has created and awareness of transporting industrial and Waste Services and registers. Afterwards, waste get info or to request sample
an online manifest system that tracks the movement hazardous waste by educating drivers and logistic manifest is filled with required information before accepting the waste.
of the waste from the waste generator to be’ah’s personnel, thus contributing towards empowering and registers as Waste Generator.
treatment sites. In addition to tracking the waste, local human resources to develop their businesses.
the manifest also ensures that every waste stream Additional
information needed?
is reviewed by be’ah’s competent team of chemists, be’ah intends to support and develop several yes
a process that ensures that the waste streams are small & medium enterprises (SMEs) in transporting
handled and treated in the correct manner. The industrial waste, thus contributing towards no
manifest also supports the economical development empowering local human resource economically.
Waste sample
Waste goes
for treatment. analysed and
accepted.
Waste accepted, then a
Point where be’ah quotation is sent to WG.
takes ownership WG signs three copies of the
of the waste. manifest before transporting
the waste (The signed manifest
by the WG is considered as an
economical bidding signature.)
WG pays the final bill. Waste is received, documentation The signed manifest shall
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 checked, weighed and sampled be handed over by the
at be’ah IWFT. Final signature of
transporter and carried out
through by the transporter.
be’ah IWFT will be applied on
the manifest and copies shall be
retained for 5 years by all parties.
Tonnes
458 391 355 657 470 591 876 413 505 1003 139 559
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
19 19 19 19 19 19 19 19 19 19 19 19
Amount of Industrial Waste Received (tonnes/month)
56 57