Page 45 - be'ah_Annual report 2019-Final2_Neat
P. 45

Al Dhahirah Governorate



            be’ah’s waste management operations                  the operations were launched in February
            in Al Dhahirah and Buraimi governorates              2017. An Average of 166 tonnes of waste
            are carried out by Al Ramooz National                was generated daily in the governorate.
            Veolia in a one contract. In Dhahirah,













            Al Dhahirah
            Average daily waste generated:





            166 tonnes/day
































            1                  0                59             12,275       354*          411,214       51
            Engineered         Transfer         Collection      Bins        Manpower      Distance      Dumpsites
            landfill           stations         trucks                      *Total for    traveled in
                                                                            Al-Dhahira    km/month
                                                                            and Al-Buraimi              1
                                                                            Governorate
                                                                                                        Dumpsite
                                                                                                        closed




                                                                                                                 45
   40   41   42   43   44   45   46   47   48   49   50