Page 45 - be'ah_Annual report 2019-Final2_Neat
P. 45
Al Dhahirah Governorate
be’ah’s waste management operations the operations were launched in February
in Al Dhahirah and Buraimi governorates 2017. An Average of 166 tonnes of waste
are carried out by Al Ramooz National was generated daily in the governorate.
Veolia in a one contract. In Dhahirah,
Al Dhahirah
Average daily waste generated:
166 tonnes/day
1 0 59 12,275 354* 411,214 51
Engineered Transfer Collection Bins Manpower Distance Dumpsites
landfill stations trucks *Total for traveled in
Al-Dhahira km/month
and Al-Buraimi 1
Governorate
Dumpsite
closed
45