Page 47 - be'ah_Annual report 2019-Final2_Neat
P. 47

North Al Batinah Governorate




            North Batinah operations started in March            early 2017. The operator distributed a total of
            2017, through the appointed service provider,        27,315 bins in North Al- Batinah where waste
            Imdad Al Batinah. The contract for Musandam          generation reached 842 tonnes per day in 2019.
            governorate was also given to the same operator













            North Al Batinah
            Average daily waste generated:





            842 tonnes/day
































            1                  2                160*           27,315       478*          711,786       53
            Engineered         Transfer         Collection      Bins        Manpower      Distance      Dumpsites
            landfill           stations         trucks                      *Total for North   traveled in
                                                                            Al Batinah and   km/month
                               Under            *Total for North            Musandam                    3
                               construction     Al Batinah and              Governorate
                                                Musandam                                                Dumpsites
                                                Governorate
                                                                                                        closed




                                                                                                                 47
   42   43   44   45   46   47   48   49   50   51   52