Page 47 - be'ah_Annual report 2019-Final2_Neat
P. 47
North Al Batinah Governorate
North Batinah operations started in March early 2017. The operator distributed a total of
2017, through the appointed service provider, 27,315 bins in North Al- Batinah where waste
Imdad Al Batinah. The contract for Musandam generation reached 842 tonnes per day in 2019.
governorate was also given to the same operator
North Al Batinah
Average daily waste generated:
842 tonnes/day
1 2 160* 27,315 478* 711,786 53
Engineered Transfer Collection Bins Manpower Distance Dumpsites
landfill stations trucks *Total for North traveled in
Al Batinah and km/month
Under *Total for North Musandam 3
construction Al Batinah and Governorate
Musandam Dumpsites
Governorate
closed
47