Page 10 - DELTA COMPANY PROFILE 02
P. 10

TELECOM INSTALLATION




                                                                 struction of complete tower sites
                                                              •  Remodeling of existing towers.
                                                              •  Electrical services including facilitat-
                                                                 ing the provision of mains electrical
                                                                 supplies and standby generators.
                                                              •  Production of layout and construc-
                                                                 tion drawings, supervision of con-
                                                                 struction of tower foundation.
                                                              •  Gathering site information from cus-
                                                                 tomer along with TND/RND.
                                                              •  RFI check along with ensuring the
                                                                 site permissions.
            •  Site acquisition.                              •  Hoisting of GSM/CDMAA/LTE anten-
            •  Soil investigation for green field tow-           nas on tower as per TND/RND.
                er sites and building structural analy-       •  Clamping and routing of RF cables
                sis for roof top sites.                          from shelter to antenna.
            •  Electrical, structural, geotechnical           •  Extending power, E1, grounding ca-
                and infrastructure engineering de-               bles to BTS.
                sign.                                         •  Fixing IGB and extending grounding.
            •  Tower foundation designs and Con-              •  Installation of battery bank and rec-
                                                                 tifier.
                                                              •  Installation of internal cable tray and
                                                                 indoor jumpers.
                                                              •  Checking VSWR and Installation Of
                                                                 Switching Nodes.
                                                              •  Commissioning the equipment as per
                                                                 defined procedure.
                                                              •  Filling the checklist and execution of
                                                                 quality audit.
                                                              •  E1 STM integration, BSS/ NSS instal-
                                                                 lation.
   5   6   7   8   9   10   11   12   13   14   15