Page 85 - CRS E-Booklet Dec-2022
P. 85
2. Prevention of signal passing at 19.04.22 03.05.22 13 13
danger
3. Examination during crew 01.05.22 15.05.22 05 05
changing by LP/ALP
4. Summer precautions 13.05.22 27.05.22 25 25
5. Ensure safety at level crossing 21.05.22 04.06.22 18 18
gates
6. Prevention of unsafe practices 01.06.22 15.06.22 04 04
7. Stabling and Securing 01.07.22 15.07.22 01 01
precautions
8. Strict observance of rules in 17.07.22 31.07.22 10 10
shunting
9. Monsoon precautions 23.07.22 04.09.22 177 177
10. Inspection of stabled rakes/
coaches in yards/stations and 25.07.22 06.08.22 01 01
other locations
11. Prevention of LC Gate open 01.08.22 15.08.22 04 04
cases
12. Maintenance of fixed assets
locomotives & rolling stock, 25.08.22 24.09.22 634 634
conformance to procedures and
monitoring of human factors
13. Maintenance of points & 01.09.22 15.09.22 30 30
crossings
14. Strict observance of rules in
shunting and granting/obtaining 14.09.22 28.09.22 06 06
line clear
15. Safe working of staff during
Track/Bridge maintenance work 23.09.22 07.10.22 10 10
and work site protection
16. Precautions to avoid brake
binding/wheel shelling in LHB
(During rake maintenance of 01.10.22 15.10.22 02 02
coaching rake in chg.depots).
17. Remove any gaps in
maintenance of fixed assets,
locomotives & rolling stock, 28.10.22 27.11.22 833 707
Ensure conformance to extant
procedures and monitoring of
human factors.
18. Working on running lines and 01.11.22 15.11.22 01 01
safety at work sites
19. Fire prevention in Pantry car 22.11.22 06.12.22 In force
20. Fire Prevention 01.12.22 15.12.22 In force
Summary of Four RB Mega Safety Drives to “(i) Remove any gaps in maintenance of fixed assets,
Locomotives & rolling stock. (ii) Ensure conformance to extant procedures and monitoring of human
factors”
83