Page 13 - 5.2 i. Manac Costing ITC Summarised Notes
P. 13

ITC EXAM PREP



                        Cost terms and concepts














             • Based on the reaction to changes in activity level,


                    costs fall into one of the following classifications:



                    • Fixed cost


                    • Variable cost


                    • Semi-variable cost


                    • Semi-fixed, also called stepped fixed cost













                                                                                                                                     13
   8   9   10   11   12   13   14   15   16   17   18