Page 16 - 5.2 i. Manac Costing ITC Summarised Notes
P. 16

ITC EXAM PREP



                        Cost terms and concepts











             • Variable cost is a cost that varies, in total, in direct


                  proportion to changes in the level of activity or volume.

                  The variable cost per unit is constant within a relevant


                  range.


























                                                                                                                                     16
   11   12   13   14   15   16   17   18   19   20   21