Chapter 1
3.2 The overhead absorption rate (OAR)
This is calculated as:
Budgeted overheads
OAR = ––––––––––––––––––––––––––
Total budgeted absorption basis
It will then be charged to each product based on the amount of usage of the activity
measure used as the absorption basis.
6