Chapter 6
1.2 Sensitivity analysis
Calculated as follows:
NPV
–––––––––––––––––––––––––––– × 100
Sensitivity margin =
PV of cash flows under consideration
The lower the sensitivity of an input variable, the more sensitive the project NPV is to
changes in that input variable.
104