Page 111 - P1 Integrated Workbook STUDENT 2018
P. 111
Variance analysis
3.2 Causes of materials variances
Materials price
Using a different supplier.
Changes to volume leading to achieving/losing bulk discounts.
An unexpected increase in the prices charged by a supplier.
Market shortages of materials.
Unexpected buying costs, such as high delivery charges.
Efficient or inefficient buying procedures.
A change in material quality, resulting in either higher or lower purchase
prices.
Materials usage
A change to the rate of scrap or wastage.
Using a different quality of material (higher or lower quality) could affect the
wastage rate.
Defective materials.
Better/worse quality control.
More/less efficient work procedures.
Changes to production methods or product design.
Changing the materials mix to obtain a more/less expensive mix than the
standard.
107