Activity based costing




               2.3  Calculating the full production cost per unit using ABC



                           There are five steps to calculating an activity based cost.

                               Identify activities.

                               Estimate cost pools.


                               Identify cost drivers.

                               Calculate cost driver rate = The total in the cost pool divided by the
                                total of the cost drivers.

                               Charge overheads to products via cost driver rates.