the hot 100


                 develop new 100 per cent hydrogen gas
                 distribution networks.
                   Let us delve into the project in
                 a bit more detail. The compliance
                 framework will be based on multiple
                 elements (subprojects). These are
                 summarised in Table 2.
                    PE materials and jointing techniques
                  investigates a testing strategy,
                  methodology and delivery model,
                  aimed at evaluating the short and
                  long-term effects hydrogen has on
                  polyethylene pipes and fittings. This
                  element will deliver performance
                  criteria against which the integrity of
                  polyethylene and jointing techniques
                  can be verified.
                    Hydrogen characteristics examines   estimation tool to allow the baseline   relationships that will enable
                  the behaviour of leaked hydrogen   hydrogen volumes necessary in   operation of SGN’s 100 per cent
                  when it escapes uncontrolled     terms of production, transportation,   hydrogen demonstration network.
                  from the network above and below   distribution and storage, and to   Going forward it will also inform the
                  ground. The work involves physical   evaluate plant footprint prior to starting   enduring regulatory regime.
                  testing and the development of   the feasibility and FEED studies.     Transportation of debris in pipelines
                  mathematical models based around     Safety case focuses on delivering   will identify if dust problems are
                  typical gas release scenarios. It was   a review of the relevant sections   likely and whether there is the
                  designed to help develop SGN’s   of GS(M)R and all associated SGN   potential for dust to damage pipelines
                  level of understanding regarding   policies, procedures and standards   and equipment.
                  hydrogen and its distribution with   with respect to constructing     Risk assessment to compare the
                  particular emphasis on uncontrolled   and operating the first hydrogen   visibility of hydrogen and natural
                  gas escapes and releases. The built   distribution network. Differences   gas fires will produce a work
                  understanding will be compared to   will be identified to enable the   instruction that provides qualitative
                  the known natural gas behaviour and   development of a safety case and   advice concerning the relative risks
                  enable quantified risk assessments   compliance framework that will   of natural gas and hydrogen fires,
                  and procedures to be developed to   ensure the safe construction and   particularly regarding their visibility
                  support the emergency process.   operation of the hydrogen network.   and flame picture. The following
                    Hydrogen consequences examines     Safety case review will allow for an   projects complement the evidentiary
                  the impact resulting from the    independent review of the safety    base for H100 undertaken in
                  concentrations, movement,        case delivered for H100 to endorse    Workstream A.
                  accumulation, ignition sources,   its validity.                     Hydrogen gas detection
                  energy required for ignition and     Academic partnership will    instrumentation will see a fit for
                  the probability of ignition from   comprise an independent review   purpose portable hydrogen
                  common appliances to the point of   and assessment by scientists from   detection instrument manufactured
                  and including detonation. Quantified   the University of Edinburgh of the   for use during the construction,
                  risk assessments will be produced,   technical work and outputs from   operation and maintenance of the
                  and they will advise on the suitability   Workstream A elements. This process   hydrogen network.
                  of the current emergency process   will ensure that work done is robust     Hydrogen excess flow valve
                  when applied to hydrogen gas.    and can be relied upon to support the   acknowledges that EFVs are a key
                  Fundamentally, the H100 project will   safety case.               safety feature of the current natural
                  only be deployed if hydrogen can     Stakeholder strategy develops an   gas network. The fitting of EFVs to
                  be assessed to be at least as safe as   effective strategy to ensure seamless   low pressure hydrogen services
                  natural gas.                     project delivery and to ensure all   will reduce the risk of high volume
                    Odorant and gas detection aims to   stakeholders understand the why,   gas escapes into property. Overall,
                  identify an odorant suited to hydrogen   how and when of the demonstration   Workstream A and its supplementary
                  in terms of its pungent smell and   network. This element ensures   projects will give a comprehensive
                  residence time. Such odorant will   that local, national and political   and credible review to support the use
                  act as an early warning system to   stakeholders are kept up to date with   of hydrogen in distribution networks.
                  ensure that the hydrogen gas can   developments in the project.    The project is currently in Phase
                  be distributed following SGN’s and     Metering validation will determine   1, during which the bulk of the
                  industry standards. This element   the technical and commercial   compliance framework is being
                  also examines existing portable gas   suitability of current UK natural gas   established and the feasibility and
                  detection instruments and assesses   meters for use with hydrogen.   FEED studies for the sites are underway.
                  their suitability with hydrogen.     HyCORAL will seek to establish   This phase will be completed in early
                    Hydrogen logistics aims to shed some   new commercial arrangements to   2020, with the ambition for distribution
                  light on the logistics of construction   support the project development.   network design and planning taking
                  and operational requirements for   This project is focused on the   place in 2020, and construction due to
                  each site. This element produced an   commercial and regulatory   start in 2021 at the selected site.