Page 19 - EOI_Wallace Bishop Retail Redevelopment
P. 19

DESIGN AND CONSTRUCT PORTFOLIO






























          MERCEDES-BENZ AUTOHAUS                ILA ARILLA RETIREMENT VILLAGE  MONASH HOUSE MEDICAL CENTRE
          VALUE: $4.0 MILLION                   VALUE: $9.0 MILLION            VALUE: $8.6 MILLION
          Design and construct of a two-level dealership   Construction of a four level apartment building   Construction of a medical centre with consult-
          featuring a mezzanine, workshop and refurbish-  and associated works, comprising 36 units,   ing suites and a ground level café with a total of
          ment of reception area. This benchmark facility is   ground floor health and wellbeing amenities and   2500m² over 3 levels and an additional 2 levels of
          to be instantly recognisable as a Mercedes-Benz   ground floor undercover carpark.  basement car parking.
          Autohaus dealership.












          CHABAD HOUSE MALVERN              NAMBOUR SELANGOR HOSPITAL ONCOLOGY  ASSUMPTION COLLEGE BOARDING FACILITY
          VALUE: $3.5 MILLION               VALUE: $0.5 MILLION                VALUE: 6.7 MILLION
          Construction of a three storey child care centre.    Extension to the existing Oncology Unit and in-  Design and construction of accommodation build-
          Involves demolition of an existing  structure,   cludes refurbishment of the oncology unit, Theatre   ings. The three new single storey boarding houses
          structural steel, insitu and precast concrete con-  Centralised Sterilisation Department, construction   including dining area, living room and associated
          struction with varying fitout finishes and façade   of new amenities and refurbishment of existing   landscaping and civil works.
          treatments.                       amenities.













          NAMBOUR SELANGOR PRIVATE HOSPITAL   LAKE VERMONT MINE EXPANSION PROJECT  DAN MURPHY’S WATERGARDENS
          VALUE: $0.35 MILLION              VALUE: $14 MILLION                 VALUE: $3.1 MILLION
          Conversion of an existing maternity ward into a   Mine Industrial Area expansion to increase coal   Design and construct of new 1,442m² Dan Mur-
          rehabilitation ward.              production from 4MT to 12MT pa. Construction   phy’s store. Scope of works include infrastructure
                                            involved the new 8 Bay Ultra Class Workshop,   for future precinct buildings, car park and loading
                                            800,000L Fuel Farm, Light and Heavy Vehicle   bay.
                                            Re-fuel, Heavy Vehicle Wash Bay and Oily Water
                                            Separation plant.












                                                                                                              19
   14   15   16   17   18   19   20   21   22   23   24