Page 18 - EOI_Wallace Bishop Retail Redevelopment
P. 18
LEISURE AND HOSPITALITY PORTFOLIO
MCDONALD’S TINGALPA MCDONALD’S COOLALINGA NT MACARTHUR CENTRAL FOOD COURT
VALUE: $1.8 MILLION VALUE: $2.1 MILLION VALUE: $1.3 MILLION
Construction of a new McDonald’s restaurant Construction of a new modern McDonald’s Refurbishment of the existing food court at Ed-
with high-end internal finishes and a contempo- restaurant with an inviting, contemporary dining ward Street mall of the MacArthur Central Shop-
rary colour scheme. space. Our team needed to ensure compliance ping Centre in the heart of the Brisbane CBD.
with local (Norther Territory and Darwin) regula-
tions with respect to the building structure to
withstand cyclonic wind conditions.
MCDONALD’S BRISBANE AIRPORT WINDSOR HOTEL BAY CENTRAL TAVERN
VALUE: $1.6 MILLION VALUE: $3.6 MILLION
Construction of a new standalone 24-hour SJ Higgins Group was involved in ongoing refur- Extension and refurbishment of existing
McDonald’s restaurant. The McDonald’s site bishment of this classic heritage hotel complex Tavern and Extension of existing Dan
was within the BNE Service Centre development over a 4 year period. The work was carried out Murphy’s
under construction by another building contrac- with various architects and project managers to
tor. As the site was located on the Brisbane ensure that the old world charm was restored
Airport site, construction works were managed incorporating modern communications systems
under strict regulations from the Brisbane Airport and building services.
Corporation. Prior to erection of roof trusses and
sheeting, our team was required to seek approval
from BAC to ensure that the crane height does
not interfere with aircraft flight paths.
MELBOURNE HOTEL BUNDABERG REDBANK PLAZA CINEMA PRECINCT TOM JOHNSON SPORTS PAVILION
VALUE: $2.4 MILLION VALUE: $2.9 MILLION VALUE: $1.8 MILLION
Extensive refurbishment of existing hotel includ- Rejuvenation project including re-construction of Redevelopment of existing sports pavilion.
ing public bar and lounge due to flood damage two entry statements, construction of a covered Construction of a northern two level wing and
and construction of an extension to the hotel outdoor alfresco dining area, painting of part of the a southern single level wing including major
consisting of new gaming room, bistro, garden façade, installation of a green wall along 2 sides refurbishment of the existing central building and
lounge, kitchen and new car park. of the multi-storey car park and rejuvenation of the upgrade to the grandstand area.
internal cinema precinct mall.
18

