Page 8 - EOI_Wallace Bishop Retail Redevelopment
P. 8

TRACK RECORD


















          SEYMOUR HEALTH            THE PENINSULA SCHOOL      WINTRINGHAM AND WALLARA AGED   BURNS BRIDGE
          “...excellent work of S.J. Higgins   “...It has been a pleasure to   CARE FACILITY  “...SJ Higgins have completed
          on this project... managed   work with SJ Higgins on the   “...The Eunice Seddon Home   the programmed stages on
          very professionally, with great   project and your staff were   has been widely applauded   time, managed unforeseen
          technical knowledge and always   extremely professional in every   for its innovative design, its   circumstances, aided in
          with a respectful understanding   aspect...”        aesthetically pleasing finish...  redesign/proposed cost
          of the needs of Seymour Health                      We found your organisation to   alternatives and cooperated
          as the client..”          THOMSON ADSETT ARCHITECTS  be reliable, adaptable, timely,   at all times...No hesitation
                                    “...Continue to include them on   on-budget and invariably   in recommending them for
          Y2 ARCHITECTURE           our preferred tendering list...”  professional throughout the   upcoming projects...”
          “...From the commencement                           project. This was particularly
          of the project and throughout   KIMBERLEY COLLEGE CARBROOK  impressive as the job included   JDA ARCHITECTS
          the construction period we   GUYMER BAILEY ARCHITECTS  many challenging elements.  “...This project was extensively
          have been impressed with   “Happy client, happy Archi-  We sincerely thank you...”  amended and extended...
          the consistent effort provided   tect, happy builder; excellent               Requiring very careful
          ...The complexity of the works   product.  What more could you   BRAND ARCHITECTS  negotiation with surrounding
          and extremely wet weather   ask for?!”              “...we commend their approach   building occupants. We
          conditions were handled                             and dedication in completing   entrusted this management
          professionally to achieve an   MONTMORENCY PRIMARY SCHOOL  the project. Their level of   responsibility to the competent
          excellent outcome...we have no   “...SJ Higgins conducted the   commitment, interaction and   site staff...”
          hesitation in recommending SJ   demolition and rebuild in  communication was consistent
          Higgins Pty Ltd           a way that minimised impact   throughout the project ensuring   CASE MEALLIN & ASSOCIATES
          for any of our upcoming   on the school’s operations   that critical project milestones   CENTRO TWEED HEADS QLD
          projects and that we have been   and our children. The team   were met.       “...demonstrated their extensive
          delighted to work alongside all   ensured open and professional   The team’s positive attitude,   experience and client focused
          SJ Higgins staff...”      communication and displayed   level of enthusiasm and   approach to this particular
                                    flexibility and creativity in   co-operation was greatly   Project... Their site management
          SMITH AND TRACEY ARCHITECTS  unforeseen aspects of site   appreciated by us and the   team was particularly astute
          “...Competent professional   management. The finished   client...”            when it came to problem solving
          company with extensive    product is outstanding and has                      which often resulted in cost
          experience in the construction   been universally acclaimed by   ARCHITECTURE HQ  saving solutions, which was
          industry...”              our community..”          “...based on integrity with all   welcomed and appreciated by
                                                              staff involved being of good   the Client...
          METHODIST LADIES’ COLLEGE  OUR LADY OF THE ASSUMPTION   character, professionally   We look forward to hopefully
          “...Project was successfully   PARISH PRIMARY SCHOOL  competent, and of a high ethical   working with SJ Higgins...”
          completed on time for us by   “...We are grateful for the   standard. In addition, the final
          SJ Higgins Pty Ltd. The project   professional and sensitive   outcome of the project was   HAYBALL LEONARD STENT
          required completion of several   manner of all your people...  delivered by a co-operative   “...Consistently capable, well
          milestones to coincide with   Their respect of the day to day   team of individuals who all   organized and resourced.
          school holiday periods. Higgins   operation of the school and their   possessed the aptitude and   They have cooperated well
          met all these critical program   constant efforts to minimise   determination to bring the   with our staff and have
          dates without exception which   disruptions...Healthy sense of   project to completion on time,   worked exceedingly well with
          ensured the project was com-  humour in challenging moments   and on budget, with out client   our clients. During out long
          pleted with the least disruption   and constant awareness of [the]   being very pleased with the   association we have been
          to the operation of the school.”  needs...”         final outcome...have the ability   impressed by their cooperative
          “...Many architectural features                     to approach their work from a   attitude, their competent
          and complexities that Higgins   MERRIANG SPECIAL    friendly and pro-active viewpoint    personnel and their expert
          identified early and carefully   DEVELOPMENTAL SCHOOL  “...  which provides us and our   carriage of the projects.
          managed  to completion...  formidable team. They built   clients with an approach that
          ...Our most satisfying construc-  a very positive working   assists project efficiency ...”  MARIAN COLLEGE
          tion project..”           relationship with the architects                    “...a very good Company to
                                    and the Principal...and always   RYTER MANAGEMENT   work with. They have delivered
          GRACE LUTHERAN COLLEGE  CA-  assured our safety. The   “...SJ Higgins NSW office...  a quality product in a timely
          BOOLTURE                  cohesiveness of all parties was   competent...dedicated   and cost effective manner....
          “The team was excellent to work   a demonstration that we had   approach to programming, cost   site team has worked especially
          with and sensitively worked  built up respect for each other...  control, quality & safety.  well with our staff in getting
          around school programs to   and the children were always a   Particular skills have been   the job done while the School
          minimise impact on the school   priority.. ...the DEECD Project   demonstrated in meeting critical   continued to operate with
          community. All are happy with   Manager, commented on the   milestone points...along with   minimum disruption....”
          end product.”             fact that our project was one of   compliance in meeting stringent
                                    the smoothest during the two   (over and above NSW statutory)
                                    year Building the Education   OHS requirements...
                                    Revolution phase in Facilities
                                    Branch.”
          8
   3   4   5   6   7   8   9   10   11   12   13