Page 61 - GMP for warehouse
P. 61

GMP Training – GMP for Warehouse by www.gmpsop.com

                                                A list showing the standard name for each starting
                                                material should be established.

                                                Standard names should be specific and be designed
                                                to minimize mix-ups.

                                                The standard names specified on this list should be

                                                used to label and identify starting materials during
                                                storage and manufacture.

                                                The standards names should be consistent with the
                                                master batch formula.


                                                The status of any material should be evident from

                                                the visual appearance of its status label.

                                                Status  labels  are  required  for  all  materials  and
                                                products, including intermediates.

                                                "Reject"  labels  should  be  used  only  for  materials
                                                that are unfit for use. Those of uncertain status or
                                                destined  for  recovery,  re-processing  and  the  like
                                                should be designated "Hold" or "Quarantine".



                                                SOP for inventory can come from a few sources:

                                                    External  customers,  such  as  suppliers  or

                                                    distributors, may submit a PO.


                                                    The  warehouse  management  system  may
                                                    generate a PO for materials when supply is low.
                                                    If this system is linked to an MRP or production
                                                    planning  system,  the  warehouse  management
                                                    system could create POs from suppliers.


                                                    Depending  on  the  company  setup,  internal
                                                    company  departments,  such  as  the  QC,  the



                                         Copyright©www.gmpsop.com. All rights reserved
                Unauthorized copying, publishing, transmission and distribution of any part of the content by electronic means are strictly prohibited.
                                                         Page 61 of 64
   56   57   58   59   60   61   62   63   64