Page 34 - DIVA_2_2013
P. 34

VA





                                                                        The Missing Link



         The opening of the CEVA will revolutionize

         public transport in Geneva


                n 15 November 2011, work   constructed using vast open-air excava-  be fitted out and the railway track laid.
                started on Geneva's new    tions rather than tunnelling. Two new   Work will take place at seven sites:
         O suburban railway line            rail bridges, one across the Arve and the   • Saint Jean-Jonction, with the com-
         known  as the CEVA -- the acro-   other over the Seymaz, will be required.   plete renovation of the viaduct over the
         nym for Cornavin, Eaux-Vives,     The intention is that, during construc-  Rhône;
         Annemasse. Preparatory work       tion, it will still be possible to access the   • La Praille with a new station at Lancy—
         consisted of demolishing buil-    shops, public transport and main roads   Pont-Rouge;
         dings, cutting down trees, and    in the vicinity of the new stations.   • The Carouge—Bachet station and the
         deviating underground pipes and                                      Pinchat Tunnel;
         cables (water, gas, electricity, tele-  An effort will be made on the Swiss part   • A station and tunnel at Champel—
         phone, Internet and drains).      of the line to respect environmental   Hôpital;
                                           concerns. Because much of the work will   • Val d'Arve including a tunnel and a
        At present, over  550,000  border cros-  take place in built-up areas, techniques   bridge,
        sings take place every working day as   will be used that will, as far as possible,   • Eaux-Vives station with a new shop-
         people come to jobs in the Canton of   limit the impact on people living in the   ping and cultural centre;
         Geneva and then go home to neigh-  neighbourhood. As work advances, in-  • And finally the Trois-Chênes sector
        bouring France --  20%  more than it   formation will be provided at each new   with the Chêne-Bourg station and the
        was in 2002. However, only 16% of these   station about progress in the vicinity   burying of the present railway line. Work
        journeys take place on buses and trams   -- each sector using a different colour   on the Chêne-Bourg-Annemasse section
         due to the fact that it is not convenient   code. Webcams placed at the principal   will not start until 2014 so that the pre-
         to reach all parts of the city quickly using   work sites will also enable you to follow   sent line can still be used by commuters
         Geneva's public transport network. The   progress day by day. Every six months,   up to that time. A special co-ordinated
         result is that in the morning and evening   the general public will be able to visit the   tram service will allow passengers to
         rush hours Geneva's roads are satura-  work-sites during open days.   reach the centre of Geneva. The crea-
         ted. CEVA will transform the journey for                             tion of a "green path" running from the
         people travelling from the Annemasse   The new station at Champel will be   station at Eaux-Vives to the frontier will
         direction to Geneva and provide an alter-  located  25  metres underground and   conclude the work.
         native to the car journey. When it comes   will consist of three levels. The tunnels
         into service in the spring of 2017 it will   of Pinchat and Champel will also have   The cost of CEVA amounts to 1,567 bil-
        be possible to reach central Geneva from   an impact on the surface of the land,   lion Swiss francs, which is financed
         more than forty railway stations situa-  particularly on the banks of the Arve at   55.47% by the Swiss Confederation and
         ted within sixty kilometres of Geneva.   Carouge where a large construction site   44.53% by Geneva. The financial arrange-
         Indeed, CEVA will make it possible to   will be located. The existing railway line   ments are set down in a convention
         connect the stations of Lausanne, Belle-  between Annemasse and Eaux-Vives   signed between the Confederation, the
         garde, Annecy, Saint Gervais and Evian.   will be placed in a covered underground   Republic and Canton of Geneva and
                                           trench, which means that the trains will   the Swiss Federal Railways (CFF). The
         There will be sixteen kilometres of rail-  make far less noise and there will be   Federal Government's share amounts to
         lway track between the stations at Anne-  many opportunities for people to cross   869  million francs, while the cantonal
         masse and Cornavin, fourteen of them   the railway lines. In order to bury the   government's contribution is provided
         on Swiss soil, two-thirds of which will   railway line, the trees in the vicinity will   through the adoption of two local laws
        be placed in tunnels. As well as the main   have to be cut down, but trees removed   and the sale of land and commercial
        station at Cornavin, five new stations will   during construction work will be re-  sites that will become available through
        be built in the suburbs of Geneva within   placed with new ones.      the construction of the new stations and
         reach of hundreds of thousands of its                                tunnels.
         citizens: Lancy-Pont-Rouge; Carouge-  From January 2012 and for the next four
         Bachet; Champel-Hôpital; Eaux-Vives;   years the construction of the rail lines   Dare we mention that what is missing
         and Chêne-Bourg. Many of these sta-  and tunnels will take place. During the   now is a bridge across the rade - a most
         tions will be located underground,   subsequent two years, the stations will   sensitive issue!

        132      Geneva
   29   30   31   32   33   34   35   36   37   38   39