STELLAR PROJECT 3:  Grabill Downtown Streetscape Improvement Project


                                                               Uses                      Quantity    Unit         Unit Cost       Total
                                       1   Mobilization and Demobilization (5%)             1        LS         $19,900.00      $19,900
                                       2   Maintenance of Traffic                           1        LS         $40,000.00      $40,000
                                       3   Erosion Control                                  1        LS         $10,000.00      $10,000
                                       4   Construction Engineering                         1        LS         $10,000.00      $10,000
                                       5   Clearing of Right Of Way                         1        LS          $8,000.00      $8,000
                                       6   Common Excavation                               160       CYS           $45.00       $7,200
                                       7   Concrete Removal                                90        SYS           $30.00       $2,700
                                       8   Asphalt Pavement Removal (Full Depth)           605       SYS           $45.00       $27,300
                                       9   Asphalt Surface Milling (1” –2” Depth)         2,185      SYS            $2.50       $5,500
                                       10  Asphalt Surface Milling (3” –4” Depth)          200       SYS            $4.50         $900
                                       11  HMA Surface, Type B, 165#/Syd (1-1/2”)          120       TON           $85.00       $10,200
                                       12  HMA Surface, Type B, 330#/Syd (3”)              35        TON           $75.00       $2,700
                                       13  HMA Wedge & Level, Type B                       80        TON           $75.00       $6,000
                                       14  Concrete Roadway Patch, 9-12” Depth, Match Existing (High Early)  235  SYS  $125.00  $29,400
                                       15  Decorative Brick (Roadway)                      205       SYS           $150.00      $30,800
                                       16  Compacted Aggregate, #53, 12” Depth (For Roadway)  140    CYS           $60.00       $8,400
                                       17  Compacted Aggregate, #53, 6” Depth              40        CYS           $60.00       $2,400
                                       18  Concrete Pavement, 6” Depth (For Driveway)      70        SYS           $100.00      $7,000
                                       19  Concrete Curb, Type III                         325       LF            $50.00       $16,300
                                       20  Decorative Brick (Sidewalk)                     50        SYS           $150.00      $7,500
                                       21  Concrete Sidewalk, Remove and Replace, 4” Depth  395      SYS           $85.00       $33,600
                                       22  Curbface Sidewalk (Under Awning)                450       SYS           $105.00      $47,300
                                       23  Concrete Driveway, Remove & Replace, 6” Depth   60        SYS           $85.00       $5,100
                                       24  Concrete Sidewalk, 4” Depth                     160       SYS           $80.00       $12,800
                                       25  ADA Curb Ramp                                   13        EA          $2,500.00      $32,500