East Allen’s Rural Revival Feasibility Matrix
ARCHITECTURAL/ PRELIMINARY
FINANCING SITE CONTROL ENVIRONMENTAL REVIEW SCHEMATIC DESIGN ENGINEERING DOCUMENTS
Not In Not In Not In Not
PROJECT NAME Identified Unknown Complete Ongoing Started Complete Process Started Complete Process Started Complete Process Started
1. East Allen Owner
Occupied Rehab X X X X X
2. Eating Healthy Active
Living Classes X N/A N/A X N/A
3. Grabill Downtown X X X X X
Streetscape
4. Leo-Cedarville X X X X X
Downtown Streetscape
5. Monroeville Forrest St. X X X X X
Sidewalks
6. Monroe St. Corridor
Improvements X X X X X
7. New Haven
Meadowbrook Trail X X X X X
8. New Haven-Adams Twp X X X X X
Community Center Park
9. Kady Gene Cove Senior X X X X X
LIHTC Housing
10. Woodburn Downtown X X X X X
Streetscape
11. Woodburn Sidewalks X X X X X
NOTES:
• Financing has been identified/committed for each of the projects.
• Projects are largely sidewalks and streetscapes within public right-of-way and the community center owned by the City. Grabill does have a building with an awning in
the right-of-way that will need to be addressed.
• A purchase agreement contingent on Stellar designation has been secured by Keller Development for the Kady Gene Cove Site. Right-of-way is needed for the
Meadowbrook Trail from one property owner with no issues anticipated.
• Red flag surveys were conducted by NIRCC on all projects aside from the Meadowbrook Trail which is currently undergoing a NEPA environmental review.
No significant environmental issues anticipated.
• Conceptual design and cost estimates complete on all projects. Architectural and engineering will commence after designation.
• OOR, Meadowbrook Trail and the Woodburn Streetscape Project are the three construction projects anticipated to be under construction first.