Page 192 - New Allen Alliance Digital Book
P. 192

Implementation Team:  Staff Resumes


                                      Jamal Anabtawi, PE — Engineer                             Chad Salzbrenner, PE — Engineer
                                      (Monroeville, New Haven, and Woodburn Project Management)  (Allen County and Grabill Project Management)
                                      Co-Owner and Director of Business Development             Project Manager, DLZ Engineering
                                      A&Z Engineering
                                                                                                Mr. Salzbrenner has 18 years of experience that spans the design and management
                                      SELECTED EXPERIENCE                                       of transportation, trail, and site projects for INDOT, LPA, and locally funded
                                      •   Flutter Road Improvement | Allen County, IN | construction administration for   projects.  His responsibilities include project management, developing various
                                       three miles of roadway reconstruction, storm sewer, two-bridge replacements   permit applications, highway and bridge design, generating roadway alignments,
                                       and traffic signal modification | LPA Des. #0400583 | $7.6 million in   improvements involving reconstruction, widening, and resurfacing, developing
                                       construction                                             maintenance-of-traffic plans/concepts, right-of-way design, developing design study
                                      •   N. Commerce Dr. and US Highway 6 Intersection Improvements | Waterloo, IN   reports, special provisions, cost estimates, the development of contract documents,
                                       | Design modifying intersection geometry to accommodate larger vehicles and   bid package preparation, and construction inspection.
                                       adding turn lanes on three of four approaches | Des. #1005996 | $0.95 million
                                       in construction                                          Expertise with design and plan preparation of projects in conformance with Indiana
                                      •   Towpath Trail | Allen County, IN | Design for l.2 miles of asphalt trail through an   Department of Transportation standards and specifications that include storm sewer
                                       environmental area, permits, boardwalk, trailhead with pavilion, traffic signal   design, pavements, curbing, sidewalks, and horizontal and vertical geometrics.  Mr.
                                       and signs | Des, #0710403 | $1.4 million in construction  Salzbrenner also has experience in reviewing consultant-designed projects.
                                      •   St. Joe Center Road Improvement | Fort Wayne, IN | Construction administration
                                       for 1.2 mile of new concrete pavement, storm sewers, sidewalk, water main,   SELECTED EXPERIENCE
                                       and street lighting | Des. #9786090 | $7.3 million in construction.  •   Pumpkinvine CR 33 to CR 20 Boundary Survey in Elkhart County, Indiana –
                                      •   Maplecrest Road Improvements Phase I and II | LPA | Fort Wayne, IN |   Project Manager –Development of an environmental document and design of
                                       Responsible for project management, engineering design, project coordination   trail utilizing Rail to Trail Program (RTP) funding through DNR.
                                       and QC/QA plans. The project consists of widening, reconstructing and   •   Northwest Bike Trail – Goshen Indiana. Development of topographic survey
                                       resurfacing existing pavement with curb and gutter, sidewalks, box culvert,   and location control route survey plat, environmental document, preliminary
                                       storm sewer, traffic signals, street lighting, landscaping, green infrastructures,   engineering, right of way engineering, right of way acquisition, permits, and
                                       landscaping, traffic signs, and pavement marking.          project bid documents.
                                      •   Husky Trail Road | Warsaw, IN | Design road rehabilitation, widening,   •   Jackson Street Trail Project in Auburn, Indiana*
                                       intersection improvements, additional turn lane, drainage, curb and gutter,   •  Cardinal Greenway Trail Project in Wayne County, Indiana*
                                       sidewalks, and street lighting. | Des. #1297651 | $1.8 million construction.  •  Towpath Trail Phase I Study and Design in Fort Wayne, Indiana*
                                                                                                •  Cougar Trail Feasibility Study in Fort Wayne, Indiana*
                                      EDUCATIONAL BACKGROUND                                    •  Amber Road Trailway in Fort Wayne, Indiana*
                                      B.S. Civil Engineering, Tri-State University, 1982
                                                                                                EDUCATIONAL BACKGROUND
                                      CREDENTIALS/REGISTRATIONS                                 B.S. Construction Engineering Technology, Purdue University, 1996
                                      Professional Engineer Indiana, 1997                       A.S. Civil Engineering Technology, Purdue University, 1995
                                      Professional Engineer Ohio, 1998                          PA Project Development Training, INDOT, 2009 & 2010
                                                                                                INDOT Right-of-Way Plan Development, 2007 & 2009
                                      YEARS OF EXPERIENCE - 35
                                                                                                YEARS OF EXPERIENCE – 18

                                   192




       EARR PLAN.indd   192                                                                                                                             11/13/18   10:49 AM
   187   188   189   190   191   192   193   194   195   196   197