Page 193 - New Allen Alliance Digital Book
P. 193
Implementation Team: Staff Resumes
Casey Erwin, PE — Engineer Derek Frederickson, P.E. — Engineer
(Allen County and Grabill Project Management) (Leo-Cedarville Project Mangement)
Project Manager Vice President
Director of the Civil / Site Group
Mr. Erwin has more than 15 years’ experience in civil engineering. Mr. Erwin
manages a wide variety of public works projects. He is experienced in water SELECTED EXPERIENCE
and sanitary collection system design, storm sewer design, water plant design, Project Engineer and Manager for numerous municipal infrastructure and site
sanitary pump stations, road and trail design. development projects, including project oversight for a .75 MGD wastewater flow
equalization facility and 1.5 MGD wastewater treatment facility in Huntertown,
Mr. Erwin provides engineering services to several small town communities in Indiana. Over his career he has planned, modeled and designed complex storm
northeastern Indiana. He is versed in all aspects of the project, including planning, water management systems, potable water networks and sanitary sewer
feasibility studies, computations and plan preparation, managing a design team, collection systems.
and obtaining local, state, and federal permits. Ewing Street Storm Sewer: Project oversight, design, permitting and management
for a new 72” storm sewer in Ewing Street between the St Mary’s River and
SELECTED EXPERIENCE Wayne Street for the City of Fort Wayne. Services also included the lowering of a
• 2018 Downtown Street Improvements (2017 CCMG Funding), Shipshewana, IN. 24” cast iron transmission water main.
This project received a 2017 Community Crossings Matching Grant, Southtown Centre: Analysis of a 750 Acre watershed, open ditch split flow
• 2018 Street Improvements (2017 CCMG Funding), Topeka, IN. This project hydraulic modeling, and design and permitting for an in-line water quality control
received a 2017 Community Crossings Matching Grant. structure and culvert replacement for the City of Fort Wayne.
• 2017 Street Improvements (West Lake Street, Indiana Street and North Street), Harrison Square and Parkview Field: Project oversight, design, permitting, and
Topeka, IN. management for the infrastructure of a new baseball stadium, parking garage,
• 2017 Community Crossings Grant Applications – Various Communities, Indiana, and hotel. Services also included reconstruction of Ewing Street, underground
Including Towns of Ashley, Fremont, Grabill, LaGrange, Shipshewana, & Topeka detention, traffic impact study, and a complex construction phasing plan.
• Downtown Revitalization Streetscape Enhancements and Façade
Improvements, Fremont, Indiana. EDUCATIONAL BACKGROUND
• Sawmill Road Extension Project – Town of Grabill, Indiana. Bachelor of Science in Civil Engineering, 1993, Michigan Technological University
• Legacy TIF Projects (North Village and Morton Street) – Town of Shipshewana -
Shipshewana, Indiana. REGISTRATIONS AND CERTIFICATIONS
• Street Packages for Various Town Communities. – Towns include Roanoke, Professional Engineer, Indiana and Michigan
Fremont, Shipshewana, Topeka, Grabill, Ashley, LaGrange and Clear Lake.
PROFESSIONAL AFFILIATIONS
EDUCATIONAL BACKGROUND Water Environment Federation
B.S. Civil Engineering, Rose-Hulman Institute of Technology, 1995
PSMJ Project Manager Training, 2015
YEARS OF EXPERIENCE – 25
193
EARR PLAN.indd 193 11/13/18 10:49 AM