Woodburn Sidewalk Improvements Project
Sidewalk improvements will be made to provide citizens improved access to the The Main Street sidewalk project is located along the south side of the road
downtown, Woodburn Community Park, and other nearby amenities. Sidewalk between Becker Street and Carl Street (425-feet). The proposed improvements
improvements will occur along Park Street, Center Street, Bull Rapids Road and include the following:
Main Street. Sidewalks improvements will consist of 5-foot wide concrete walks. • Removal of existing concrete sidewalk.
• Construct new concrete sidewalk, and new curb & gutter.
GRABILL The Park Street sidewalk project is located along both the east side and west • Reconstruct existing concrete drive approaches.
side of Park Street, between Main Street and Front Road (0.23 miles). The proposed • Decorative Street Lighting (6 lights along Main Street)
improvements include the following: • Patch the existing asphalt pavement around approaches
HARLAN • Removal of existing concrete sidewalk.
• Construct new concrete sidewalk. Impact:
• Reconstruct existing concrete drive approaches. • Improvement of the existing sidewalk system in connection to various amenities
HOAGLAND • Construct new curb and gutter on both sides of drive approaches. throughout Woodburn while also providing new sidewalks to ensure safe access
• Construct new concrete alley approach routes.
• Patch the existing asphalt pavement around approaches • Meets the goals of the NewAllen Strategic Investment Plan and Woodburn ADA
LEO-CEDARVILLE Transition Plan
The Center Street sidewalk project is located along both the east side and
west side of Center Street, between Main Street and Front Road (0.24 miles). The
MONROEVILLE proposed improvements include the following: Readiness:
• Construct new concrete sidewalk and new concrete drives. • Local match funding to cover project development costs and 20% construction
• Construct new curb and gutter on both sides of drive approaches. costs committed by City of Woodburn resolution.
NEW HAVEN • Patch the existing asphalt pavement around approaches. • Preliminary engineering completed.
• Construct new 6” concrete curb along sidewalk. • Red flag survey conducted. No major environmental issues identified.
• No permits identified as needed.
WOODBURN • No acquisition anticipated, within the public right-of-way.
The Bull Rapids Road curb walk project is located along both the east side and
west side of Bull Rapids Road, between Main Street and Front Road (0.13 miles).
The proposed improvements include the following: Budget: $591,069.50
• Removal of existing concrete curb walk.
• Construct new concrete new curb walk. Funding Partners:
• Reconstruct existing concrete drive approaches. City of Woodburn
• Patch the existing asphalt pavement along approaches and curb walk. Indiana Department of Transportation – Stellar CDBG Funds