Woodburn Sidewalk Improvements Project


                                      Sidewalk improvements will be made to provide citizens improved access to the   The Main Street sidewalk project is located along the south side of the road
                                      downtown,  Woodburn Community Park, and other nearby  amenities. Sidewalk   between  Becker Street  and Carl  Street (425-feet). The proposed  improvements
                                      improvements will occur along Park Street, Center Street, Bull Rapids Road and   include the following:
                                      Main Street.  Sidewalks improvements will consist of 5-foot wide concrete walks.   •  Removal of existing concrete sidewalk.
                                                                                                •  Construct new concrete sidewalk, and new curb & gutter.
                    GRABILL           The Park Street sidewalk project is located along both the east side and west   •  Reconstruct existing concrete drive approaches.
                                      side of Park Street, between Main Street and Front Road (0.23 miles). The proposed   •  Decorative Street Lighting (6 lights along Main Street)
                                      improvements include the following:                       •  Patch the existing asphalt pavement around approaches
                    HARLAN            •  Removal of existing concrete sidewalk.
                                      •  Construct new concrete sidewalk.                       Impact:
                                      •  Reconstruct existing concrete drive approaches.        •   Improvement of the existing sidewalk system in connection to various amenities
                   HOAGLAND           •  Construct new curb and gutter on both sides of drive approaches.  throughout Woodburn while also providing new sidewalks to ensure safe access
                                      •  Construct new concrete alley approach                    routes.
                                      •  Patch the existing asphalt pavement around approaches  •   Meets the goals of the NewAllen Strategic Investment Plan and Woodburn ADA
                LEO-CEDARVILLE                                                                    Transition Plan
                                      The Center Street sidewalk project is located along both the east side and
                                      west side of Center Street, between Main Street and Front Road (0.24 miles). The
                 MONROEVILLE          proposed improvements include the following:              Readiness:
                                      •  Construct new concrete sidewalk and new concrete drives.  •   Local match funding to cover project development costs and 20% construction
                                      •  Construct new curb and gutter on both sides of drive approaches.  costs committed by City of Woodburn resolution.
                  NEW HAVEN           •  Patch the existing asphalt pavement around approaches.  •  Preliminary engineering completed.
                                      •  Construct new 6” concrete curb along sidewalk.         •  Red flag survey conducted.  No major environmental issues identified.
                                                                                                •  No permits identified as needed.
                  WOODBURN                                                                      •  No acquisition anticipated, within the public right-of-way.
                                      The Bull Rapids Road curb walk project is located along both the east side and
                                      west side of Bull Rapids Road, between Main Street and Front Road (0.13 miles).
                                      The proposed improvements include the following:          Budget:  $591,069.50
                                      •  Removal of existing concrete curb walk.
                                      •  Construct new concrete new curb walk.                  Funding Partners:
                                      •  Reconstruct existing concrete drive approaches.        City of Woodburn
                                      •  Patch the existing asphalt pavement along approaches and curb walk.  Indiana Department of Transportation – Stellar CDBG Funds