Page 91 - New Allen Alliance Digital Book
P. 91
Key Legend:
FRONT ROAD Existing Elements
City Water Utilities Building
A
B Water Tower
10
C Baseball Diamond
B
D Batting Cage
A Newly designed
E Restroom and Concessions Building
F Pavilion park walks and
1
G Parking Lot trails will better
H Two-story Storage Building
5
I Playground connect the park
C J Existing Storage Building
1 and its recreational
K Fire Department
C L Community Center facilities to the
1 D
M Woodburn City Hall surrounding
Proposed Elements
C neighborhoods
D 1 Proposed Trails
SATE ROUTE 101 3 West Drop-off Cul-de-sac downtown.
C E 2 Promenade (Existing Overmeyer Street) and Woodburn’s
11
1 1 F 4 5 Basketball Court
PARK STREET 12 6 7 Splash Pad
Seating Nodes
East Drop-off Cul-de-sac
OVERMEYER STREET 8 Multi-use Play Surface
OVERMEYER STREET H 2 7 9 Parking Lot Improvements
3
16 Future Elements
9
6 I 15 Proposed Parking Lot, Sidewalk, and Landscape
5 13 10
14 8 J Improvements
G 5 11 Outdoor Chess/Checker Boards
4 12 Proposed Parking Lot With Dumpster
Enclosure
1 M FAHLSING ROAD 13 Corn Hole
L
K 14 Upgraded Playground
17 15 Pickle Ball Courts
16 Proposed Parking Lot
18
17 Proposed Drive and Parking Lot Improvements
Proposed Parking Lot, Sidewalk, and Landscape
MAIN STREET 18 Improvements
Woodburn Community Park Woodburn Community Park: Before and Proposed After
Preliminary Master Plan Feet
August 17, 2018 0 40 80
© 2018 Jones Petrie Rafi nski - All Rights Reserved
91