Page 42 - MY STORY
P. 42

REVIEW AND APPROVAL

            Every assigned action had to be documented in a formal

            engineering report format. No new assignment would be
            given until the old one was complete, written, approved,

            and in the Douglas report system. I thought I could write
            reasonably well until my first report was submitted to Joe
            W.  It came back with red pencil marks all over it, along
            with almost unreadable comments (Joe’s handwriting was

            absolutely atrocious and virtually non-legible).  Not only
            was my  report  not properly  succinct,  I was  accused  of

            mixing “fact with desire” and combining “results” with
            “data interpretation.”


            In the beginning, it took me about four tries to get a report
            through  Joe,  and  --  don’t  forget  my  report  had  been
            reviewed and approved by two lower levels of supervisor.

            Needless to say, my report writing had to improve quickly
            and dramatically over time.  This one of many lessons
            I’ve tried to pass  on as an engineering manager  - with

            mixed success.