Page 270 - BiM committee - ISSUED_Neat
P. 270
Keynote required
Keynote Process
Check google sheet if same keynote exist for project
YES
Check spec exist with matching
keynote number
YES NO
NO
Read spec description if it matching
with what you need
NO
YES
Check Keynote manager to see if Contact Spec dep. to add required
keynote have been added spec. Once spec number is
assigned, add it to google sheet
YES under correct division and add it to
NO
keynote manager.
Use existing Keynote Add keynote to keynote manager DO NOT COPY FROM GOOGLE
and use the keynote SHEET TO KEYNOTE MANAGER