DURO-SHIELD ACRYLIC MAINTENANCE ROOF COATING
INSTALLATION: 6. Coating
1. General a. Stir until an even consistency is achieved. A
Only apply product when the ambient slow-speed drill with mixer attachment is
temperature is between 50º F (10° C) and 95º recommended.
F (35° C). Product must be stored between 60º b. For proper coverage, product must be applied
F (15° C) and 80º F (26° C) for 24 hours prior in 2 coats. Apply first coat at approximate
to installation. coverage rate of 67 square feet per gallon.
Do not apply when rain, cold or nightfall are c. Allow to dry completely. Refer to drying times
imminent. Relative humidity must be below 80%. on product data sheet.
In extreme hot, windy, or dry conditions, wet the d. Apply second coat perpendicular to first coat
surface to be coated with a fine mist of clean and at approximate coverage rate of 67
water just before applying Duro-Shield Acrylic square feet per gallon.
Maintenance Roof Coating.
e. Allow to dry completely. Refer to drying times
Thinning the product is not allowed. on product data sheet.
Use a brush, roller (1-inch nap, min.), or airless CLEANUP:
sprayer to apply. Best results are obtained when Uncured product may be removed by wiping with
using an airless sprayer. Care should be taken warm water, soap and a clean cloth.
when using an airless sprayer to apply Duro-
Shield products. Wind-blown over-spray may Application equipment should be cleaned
damage property adjacent to the project site. immediately after use with warm water, soap and
a clean cloth.
2. Substrate Preparation
a. Repair, if necessary, the substrate by
following Substrate Preparation instructions
within the Duro-Shield Maintenance Roof
Coating Installation Guide.
3. Cleaning Procedures
a. Apply to surfaces which are clean, dry and
free of oil, mildew, grease or any other
contaminants. Follow Cleaning Procedures
within the Duro-Shield Maintenance Roof
Coating Installation Guide.
4. Seam Treatment
a. Repair, if necessary, all horizontal and vertical
seams by following Seam Treatment
instructions within the Duro-Shield
Maintenance Roof Coating Installation Guide.
5. Priming
a. Follow Priming instructions within the Duro-
Shield Maintenance Roof Coating Installation
Guide.
www.duro-last.com 2 of 2 800-248-0280