P. 9

Hull Waste Water Treatment Works


   ● RoadCem used for access, working platforms and
      compounds/laydown areas.
   ● RoadCem constructed with soft existing soils.
   ● Large tracked cranes and piling rigs operated on
     RoadCem platforms to install driven piles and to
     lift construction components/formwork etc.
   ● RoadCem access roads to be incorporated into
     permanent works.
   ● Use of RoadCem facilitated continuation of heavy
     construction work during very wet weather to
     meet challenging programme.
   ● The Client was very pleased to have been able to
     carry on working during wet weather which was
     considered would otherwise been unmanageable.