Page 9 - RoadCem Working Platforms for Piling Case Studies
P. 9
Hull Waste Water Treatment Works
● RoadCem used for access, working platforms and
compounds/laydown areas.
● RoadCem constructed with soft existing soils.
● Large tracked cranes and piling rigs operated on
RoadCem platforms to install driven piles and to
lift construction components/formwork etc.
● RoadCem access roads to be incorporated into
permanent works.
● Use of RoadCem facilitated continuation of heavy
construction work during very wet weather to
meet challenging programme.
● The Client was very pleased to have been able to
carry on working during wet weather which was
considered would otherwise been unmanageable.