Page 2 - PPAP submission requirements (PPAP check sheet)
P. 2

PPAP submission requirements (PPAP check sheet)

      Part name :                Part no.                Supplier name                          Supplier Code  Model
              TRAY, TOOL KIT            49404-A0010-A                 THAI EPP FOAM CO., LTD.
      ECI no. and detail                                                                                       SPA1

      A)  All PPAPs shall be submitted to 'Level 3' unless a deviation is authorized.
      (Any deviation approval must accompany submission)                                For Supplier
                                                                                                             Submission
                                                       MINE    MINE    MINE                     Reason         date
       No.               Requirement element                                  Need  No Need                  (DD/MM/YY)
                                                       Format  Incharge  Support               (If No Need )
       1  Design Records
          1.1) Approved Drawing                          ✓      RD              ✓
          1.2) Design Record sheet                       ✓      RD              ✓
          1.3) IMDS Reporting                                   SQ              ✓
       2  MINE Mobility Engineering Change Request Documents (ECR)  ✓  RD  SQ   ✓
       3  MINE Mobility Engineering Approval (ECI)       ✓      RD              ✓
          Design Failure Mode and Effects Analysis ( DFMEA )
       4                                                        RD      SQ            ✓       Not applicable
          (If you are the owner of product design)
       5  Process Flow Diagram                                  SQ              ✓
       6  Process Failure Mode and Effects Analysis ( PFMEA )   SQ              ✓
       7  Control Plan                                          SQ              ✓
       8  Measurement System Analysis (MSA)                     SQ              ✓
       9  Dimensional Results
          9.1) Inspection Standard/Data Sheet            ✓      QA              ✓
          9.2) Full-Layout Inspection (N = 5)            ✓      RD      SQ      ✓
          9.3) Inspection Report (N = 5)                 ✓      RD      SQ      ✓
       10  Records of Material / Performance Test Results
          10.1) Material & Component part lists          ✓      RD      SQ      ✓
          10.2) Raw material test result                        RD      SQ      ✓
          10.3) Part Performance Evaluation                     RD      SQ      ✓
          10.4) Raw Material Color Standard Plate        ✓      RD      SQ      ✓
       11  Initial Process Studies (PPK)                        SQ              ✓
       12  Qualified Laboratory Documentation (If have)         SQ              ✓
       13  Appearance Approval Report (Colors, Grain, Surface appearance)  RD  SQ  ✓
       14  Sample Production Part                               RD      SQ      ✓
       15  Master Sample                                 ✓      RD      SQ      ✓
       16  Checking Aids
          16.1) Checking aids inspection result                 QC      SQ      ✓
          16.2) Calibration and preventive maintenance plan     QC      SQ      ✓
       17  Customer-Specific Requirements
          17.1) Supplier Quality Assurance Contact       ✓      SQ              ✓
          17.2) Supplier Schedule include Tooling, C/F Schedule  SQ             ✓
          17.3) Process Lay out                                 SQ              ✓
          17.4) Packaging Standard                       ✓      LG              ✓
          17.5) Tooling and Part buy off acceptance for payment Phase 2, 3  ✓  PC  ✓
          17.7) Quality problem follow up sheet          ✓      SQ              ✓
          17.8) Part Key Point                           ✓      SQ              ✓
          17.9) Supplier Process Audit                   ✓      SQ              ✓
       18  Part Submission Warrant (PSW)                 ✓      SQ      RD      ✓



      Remark :                                                       Supplier signature :   ________________________________________
                                                                                (         Mr. Tanongsak  Chuayta  )
                                                                                           28  /  4  /  20
   1   2   3   4   5   6   7