Page 269 - PPAP submission requirements (PPAP check sheet)
P. 269
ESLEN THAI CO.,LTD.
FACTORY LAYOUT
Guard ISO 9001:2015
Canteen Toilet Room Safety statistics ISO 14001:2015
L-01 L-05 Locker E-24 L-02
Smoking Area Parking Area L-04 Parking Area
L-06
E-23
K-04 OFFICE 1st
E-2 Store
Maintenanc Non-Conforming J-01 Store B-01 T E-3 E-4 E-5 E-22 OBEYA ENGINEER E-23
e Area Deliver Deliver Sample QC E-21 T1 T2 3 T4 T8 T5 T6 K-03 ROOM Toilet
y
y
EPP Pre-pressurize Air tank EW3 E-33 E-32 No.01
EW5 No.21 K810
K813 EPS
IPQC. No.02
K810
EPP Barcode Inspecto No.20 A-01
r
E-40 E-41 E-42 E-43 E-44 OQC.Area E-01 K813 E-15 No.03 B-03 EPS
K810
STORE EPS I-02 STORE Parking Area Barcode System No.19 No.04 SILO EW1
RECYCLE L-08 AREA Packing AREA I-01 E-02 Production A 1st. Floor EPP BSH168 Production E 2nd. Floor EPS. K810 SKK-110T EPS
area Receivin EPP H-01 EPP Packing BSH168 Production A 1st. Floor No.05 E-25
No.18
E-26
K810
Motocycle EW4 E-39 G-01 D-02 BSH168 No.07 Pre-Expandable B-02
STORE
E-38
F/G
EPS E-37 g Area Store E-19 & Barcode No.06 E-15 SKK-70 4 MATERIAL
E-20
K810
EPS
No.17
K810
EPP Store 5 No.16 D-01 No.10 K810
E-18 E-16 Foam Cutting F/G No.11 No.08
EW6 WIZ25
Area EPP K68 K810 3
RECYCLE STORE M-05 Maintenance D-03 G-02 Non-Conforming EPS No.15 Area Non-Conforming No.12 No.09 Mould
Area
Shop Accumulator WIZ25 K68 K810 Shop
C-03
MOULD RANK Toilet L-03 T7 No.14 EW2 No.13 E-13 1 E-9
Blank
WIZ40
C-02
C-01 PROCESS
MLOUD LAYOUT M-01 M-02 DRY DRY DRY DRY DRY DRY M-06 BOTLER 2 M-04
MOULD RANK MOULD RANK E-12 F-01 DRYING E-11 E-7 E-8 E-26
AIR
C-04 E-6 ROOM ROOM ROOM ROOM ROOM ROOM COMPRESSOR CONTROL BOILER
E-1 C3 A-02 No.6 No.5 No.4 No.3 No.2 No.1 ROOM 4 TON
EPS
EPS
EPP
EPP
EPS
EPS
M-03
6
Residence Maintenance MOULD
Room ASSEMBLY MOULD RACK MOULD SCARP AREA C2 A5 A4 A3 A2 A1 M-07 T5 T3 T1 N-01
Mat'
L-06 Cooling Tower WARTER PUMP EPP MATERIAL STORE AREA RO E-14 RO AIR COMPRESSOR T6 T4 T2 Storage
FACTORY AREA C1 K-01 Conferance Room M-03 Boiler Control Room RO. AREA N-02 Boiled water
หมายเหตุ หมายถึง พื้นที่เสี่ยงอันตราย (Risk of Safety Area) ห้ามเข้า 6 จุด ก่อนสวมใส่อุปกรณ์ PPE A-01 Material Store EPS C-03 Mould Shop F-01 Drying Room 1-6 L-04 Parking Area K-02 ESLEN THAI CO.,LTD.
C-04 Mould Assembly G-01 Finishing Area K-02 Manager Room L-05 Toilet M-04 Boiler Area Manager DRAWIN G TITLE: FACTORY LAYOUT
Room
A-02 Material Store EPP
สัญลักษณ์ จุดติดตั้งถังดับเพลิง จุดติดตั้งตู้ดับเพลิง D-01 Moldind Machine 1-13 G-02 ReduceMoistur Area K-03 Spare part Room L-06 Residence Room M-05 Maintenance Area OFFICE SCALE 1 : 250
B-01 Pre-Pressurize 2nd fl.
D-02 Moldind Machine 14-21 H-01 Packing Area K-04 Office L-07 Tuck Park M-06 Air Compressor Area UN IT MM.
เครื่องฉีดโฟม K810 = 10 เครื่อง K68 = 2 เครื่อง WIZ25 = 2 เครื่อง WIZ40 = 1 เครื่อง B-02 Pre-expanding Room D-03 Foam Sheet Cutting Area I-01 Receivi ng Store Area L-01 Canteen L-08 Recycle M-07 Air Tank Area E-34 REV.N O. 01
B-03 Silo Area E-35 K-01 Reference ISSUED DATE 24/06/2019
Room
K1214 = 1 เครื่อง BSH168 = 3 เครื่อง K813 = 2 เครื่อง EPP = 5 เครื่อง EPS = 16 เครื่อง C-01 Mold Rank A E-01 In process QC I-02 Store Area L-02 Guard House M-01 Cooling Tower N-01 Coal Store E-36 PREPARED BY TAN ON GSAK
E-02 Out-going QC J-01 Delivery Area L-03 Rest Room M-02 Water Pump N-02 RO. Area
C-02 Mold Rank B-E