                                 The locate service uses the following color codes to identify underground utilities:
              Table 4            Color codes for locating utilities


                                  Color                            Utility
                                  White                            Proposed excavation area
                                  Pink                             Temporary survey markings
                                  Red                              Electric power lines, cables, conduit, and
                                                                   lighting cables
                                  Yellow                           Gas, oil, steam, petroleum, or gaseous
                                                                   materials
                                  Orange                           Communication, alarm or signal lines, cables,
                                                                   or conduit
                                  Blue                             Potable water
                                  Purple                           Reclaimed water, irrigation, and slurry lines
                                  Green                            Sewers and drain lines


                                 NOTE: Use white paint to mark the area within which you want utility locations.
                                 Once all utilities are located:
                                 •   Do not dig with machinery within 24 inches of the locate marks.
                                 •   Hand dig to expose all utilities to be crossed.



              Coordinating utility trenching and construction
                                 New construction typically involves the installation of telephone cables, cable television
                                 cables, and natural gas lines; as well as electric power cables.
                                 It is the responsibility of you and your builder to notify each utility about your intended
                                 electric service installation as well as all other utilities providing service to your new
                                 structure.



              Transformer locations

                                 PSE will install padmount transformers using the clearances listed in Table 5 and shown
                                 in Figures 3 through 6.
                                 Clearances between padmount transformers and structures must be measured from
                                 the metal portion of the transformer closest to the building or structure (including any
                                 overhangs).