Our Products & Services




           Horan Automation & Consulting provides a full design and project management service. We are not affiliated to any
           equipment suppliers, which mean we provide totally independent advice to our clients.




                                                 Specification & Sourcing of
                   Feasibility Study                                               Design of Bespoke Equipment
                                              ‘Standard Production’ Equipment















           Before starting any project large   For the majority of automation   Some part of most production
           or small a “feasibility study”     processes there is already        processes will require a
           needs to be carried out.           available, standard machinery     bespoke piece of equipment.
                                              and equipment.
           With our wide experience in production                               Horan  Automation  &  Consulting
           automation this can be as simple as a   Horan Automation & Consulting have   are uniquely positioned to provide
           “walk through” your production facility   the knowledge and expertise to find   this service. With over 20 years’
           or a more in-depth study which will   the most suitable equipment for the   experience in automation design and
           determine if it can be done, a budget   job in hand.                 manufacture we have the facilities
           cost, and a realistic timeline for the                               to design and test this equipment
                                              Our normal system of operation
           project. This report will usually be                                 before going into production.
                                              is to identify a number of potential
           part of a C.E.R. (Capital Expenditure
                                              suppliers (up to 10). Following outline
           Request) to the finance department.
                                              discussions with these suppliers we   All our design is done using Solid
                                              reduce this list to the 3 most suited to   Works 3D design software, and robot
                                              the project. We then investigate these   simulation is also available using
                                              suppliers and their equipment in detail   RoboGuide software.
                                              to ascertain the technical details of the   Depending on the complexity of the
                                              machinery and the expertise of the   equipment the design process may
                                              staff. We then present these 3 options   include the manufacture and testing
                                              to our client with a recommendation of   of a prototype before the final design
                                              the most suitable one.            is complete.

                                              Once a supplier is selected we enter   Once the design is completed we
                                              into discussions with them to specify   can then manufacture, install and
                                              the machine exactly, focusing on the   commission the equipment on our
                                              components to be used such as the   client’s site and also integrate it with
                                              PLC type, the electrical components,   other machinery on the line. All bespoke
                                              and the pneumatic system. This is a   equipment is supplied to our client with
                                              very important part of the specification   full documentation including, electrical
                                              as ideally all equipment in the   drawings, Software programmes and
                                              production line should have the same   a copy of the Solid Works 3D model.
                                              components. This reduces the cost of   All equipment is CE marked and carries
                                              training for maintenance staff and spare   12 months parts and labour warranty.
                                              part being held in stock in the future.