Page 110 - B8773-AEW-XX-XX-PP-A-0001_[P1]_Contractors Manual
P. 110

5.3 Standard Drawings                                                                                                                             s oc ket s mu s t be u s ed for bot h c l ean power an d dat a i n t h e three computer positions on the makeline wall.

                                                                                                                                     Power s oc ket s mu s t ALWAYS be pos i t i on ed t o t h e fron t at bot h of t h e Sl ap Tabl e pos i t i on s , an d t o t he rear at the Makeline position. i.e Handed, depending on store layout.

                                                                                                                                     If the slap table is very long there may be an additional screen towards the counter end. This is a duplicate of the screen at the makeline end of the slap table and the
                                                                                                                                      V GA cable goes to the f ar end of the makeline in the same way.

                                  DOMINO'S PIZZA UK & Ireland LTD                                                                    Sus p. Cei li ng               s oc kets.               For men u sc reen wiring                    VG A Cable                                              To offi c e IT
                              1 Thornbury                                                                                                              See n ot es above                     s ee drawi n g No. MAN 033                  Su s pen ded Ceiling                                    Cabin et
                                                                                                                                                       re posi ti ons
                          West AShland                                                                                                                                                                                       s oc kets.                                                   s oc kets.
                       Milton Keynes                                                                                                                                                                           See n ot es above                                            See n ot es above
                                                                                                                                                                                                               re posi ti ons                                               re posi ti ons

                                                                                                                                                           508                  Menu               508                                                         508
                                                                                                                                                           int                  s creens on        int                                                         int
                                                                                                                                                                                D owns tand
                                                                                                                                                                     3 89 int                                  389                                                         389
                          Drawn by: P.Y.      Plan no.: MAN - 03  Plan title:  Plan title: Makeline Wall - IT and Electrical Wiring  These two groups at                                                       int                                                         int

                       Rev (Pulse ) 6 Jan 11                                                                                         opposite ends of the                                    1800
                                                                                                                                     S lap table

                                                                                                                                                                                                                                                               2000

                                                                                                                                                                                             600

                          Scale: NTS          Date: 3 Mar 08                                                                         All CAT 5 cables terminate in either wall                    NOTE:
                                                                                                                                     sockets or patch panels, at both ends.                       Th e s oc ket s h ou l d ALWAYS be at the left hand end of
                       01 Jul 11 14 Nov 11                                                                                                                                                        t h e Makel i n e, NOT BE H IND OR ABOVE THE MAKELINE.
                                                                                                                                     All CAT5 RJ45 wall sockets and patch panel
3 February 2016                                                                                                                      sockets MUST be marked identically for EACH
                                                                                                                                     individual cable.
   105   106   107   108   109   110   111   112   113   114   115