DESIGN













       D7.6 Storerooms and Corridors                         D7.7 Corrals

       Where  extensions  or  alterations  to  store  rooms   External storage  space is often  restricted  at
       are  requested,  the  following  specifications       restaurants especially as freezers and chillers are
       should be used:                                       frequently extended into these spaces without
                                                             increasing  the  provision  for  bin storage.  The
       Floor                                                 construction  of existing corrals can vary from
       200x200mm Bianco a Carbo anti slip tiles from         modular units, traditional brick / block walls to
       Vogue  Ceramic.  4mm grout  joints,  anthracite.      simple timber enclosures. Unless advised to do
       No checquer plate should be used as flooring.         otherwise, extensions should mimic the existing
                                                             style and construction technique.
       150mm ceramic skirting tile for all walls prior to
       wall finishes beginning.                              Where corrals or bin stores are being raised to
                                                             the ground or built from new then the preferred
       Walls                                                 finishing materials are traditional brick or timber
       Decorated plasterboard; dulux ivory. Additional       effect trespa.
       mid and low level rail protection  or  hygienic
       cladding as kitchens.                                 Corral floors should be brushed concrete (laid
                                                             to falls to a gulley).
       Ceilings
       Often no ceiling finish. Alternatively satin spar as   All corrals require small power (for compactors
       kitchen specification.                                and the like), and utility lighting.


       Doors                                                 A water stand pipe  is  also frequently required
       Solid core  with hardwood  lippings.  Balanced        to enable wash down which must be provided
       laminate                                              via a break tank.  Refer  to  CDM Partnership
       -  Entrance  door  to  be polyrey cream  to  the      performance specification for further details.
         outside  and  interior  concept  timber  finish  to
         insider face.                                       Where  waste compactors are  used, localised
       -  WC and change  doors to  be as public WC           smoke detection must be provided.
         doors  except where  facing into the crew
         room  which should be the  interior  concept
         timber finish.

       Ironmongery
       All ironmongery to SAA or stainless steel including;
       300mm kick  plates, D type  pull handle,  push
       plate, door  closer,  door  stop,  3 sets of  hinges,
       barrel lock (key operated to both sides).


       Shelving
       Shelving design and supply will be undertaken
       by Tardis. This should be coordinated  via the
       project manager.




        D7.6           Storerooms and Corridors            3.0                        09 February 2017
        D7.7           Corrals                             2.0                        23 June 2016