Page 17 - B8773-AEW-XX-XX-PP-A-0003_[P6]_Franchisee Toolkit
P. 17

DPG PM / Acquisitions Surveyor  Franchisee  Principal Designer  Principal Contractor
         (As defined under the CDM Regulations 2015)

 Notify Building Control                       Take possession and secure the site.
                                                                                               Start on Site
 Provide Principal Contractor with vacant      Ensure necessary insurance cover is in place.
 possession of the site
                                               Provide welfare facilities on behalf of
 Ensure that welfare facilities are in place   the franchisee as required under CDM
                                               Regulations 2015. Guidance on appropriate
 Manage all Building Regulations               levels can be found on the HSE website
 Site Inspections & Site Certification
 Documentation via the Principal Contractor.   Notify Building Control Approved Inspector /
                                               Local Authority of proposed start on site date.
                                               Arrange and co ordinate schedule of Building
                                               Control inspections for duration of site works,
                                               ensuring that inspections are planned to
                                               coincide with key dates (such as covering up
                                               of works)

 Site visits / audits / inspections to be carried   Undertake / review  valuations where   Liaise with the PC during the construction   Ensure compliance with CDM Regulations   Construction
 out by DPG Project Manager to assist   required  phase.  2015 and over see all aspects of Health &
 contractors with site queries where required.  Safety on site during construction phase.
 Make payment to the contractor - abiding   Review any changes made to the design
 Provide general guidance to franchisee   in full with the timing and split of staged   during the construction phase  Progress works diligently and in a workmanlike
 with regard to industry regulations and best   payment terms as agreed at the On Site   manner.
 practice.  Briefing / Pre Start Meeting.
                                               Report any issues / potential delays to the
 Support franchisee with induction / up skilling   Recommended % split of staged payments   franchisee or DPG Project Manager.
 of new shop fitting contractors.  as follows:
                                               Liaise with Building Control with regards
 - 40% on commencement                         to site inspections and site certification
 - 40% on completion                           documentation.
 - 20% on final account*
                                               Responsible for all aspects of Health &
 (2.5% retention to be held for six months post   Safety on site including coordination of
 completion)                                   sub-contractors whether employed by
                                               the Principal Contractor or directly by the
 All payments to be made within 28 days of     franchisee.
 date of invoice.
                                               Notify the HSE for projects that meet the
                                               required threshold

 Provide EPC report via specialist consultant.  Follow agreed handover / inspection   Arrange final Building Control inspection and   Completion / Handover
 procedure with Principal Contractor           obtain Final Approval notices as required.

 Receive O&M manual from Principal             Follow agreed handover / inspection
 Contractor, collate all Health & Safety       procedure with franchisee, including review
 documentation and handover to DPG team        of defects list.
 as required.
                                               Carry out final clean down and clear site.

                                               Handover of possession and insurance liability
                                               to the franchisee.
                                               Handover O&M manual comprising all test
                                               certificates, as-fitted information and Building
                                               Control completion certificates to Franchisee.

 Inspect work and check that the project   Ensure compliance with DPG brand   Collate information from the PC and Project   Make good any defects identified in the   Post Completion Inspection
 complies with DPG corporate / brand   standards  Team to complete and then issue the H&S File  schedule in accordance with agreed time-
 standards.  to the Client and DPG.            scales.
 Settle Final account

 Release retention in accordance with agreed
 time-scales








                                                                                                               17