Page 35 - Perfect Garage Conversions
P. 35
FLOORING
Generally the floating floor method
is used
Damp proof membrane is laid first
Kiln dried sand to level floor
Foil backed insulation is then laid
22mm toughed and grooved chipboard is laid on
top as a finishing surface
Board is locked down via timber wall studwork
If required we will also lay a Suspended timber
floor